
Install & Operation Manual
Borg & Overström
GB
5
Installation
Tap Installation
1
Identify a suitable location for the undercounter unit. It
should be positioned within 1.0m of the faucet, and
within 2.0m of a suitable services connections:
Service Requirements
Water: Mains potable water – 2.0bar recommended. Min 1.0bar
Electricity: 13A supply – Earth Leakage Protected.
2
3
4
When planning and providing
for the connection to the
services, always allow for
easily accessible service isolator
fittings and for the position of an
external water filter.
Identify a suitable position for
the tap. A 50mm (max) hole is
required for a three headed tap,
and a 35mm (max) hole for a
two headed tap.
When positioning to drain over
an existing sink bowl, allow for
the reach of the tap levers or
otherwise the position of any
optional drip tray. 168mm to
middle tap, 148mm to outside
taps.
50mm/35mm
148mm
168mm
Содержание u2 40L
Страница 29: ...Borg Overström GB 29 Install Operation Manual ...
Страница 30: ...Borg Overström GB 30 Install Operation Manual ...
Страница 31: ...Borg Overström GB 31 Install Operation Manual ...