
Borg & Overström
GB
10
Install & Operation Manual
Insert ducting box into its cut slot in the Bottom panel. Then insert the air ducting into the ducting box until it reaches its limits.
Then cut the air ducting so that it is flush with the kickboard.
Centrally locate the ventilation grille over the kick board cut out, then using self tapping screws, secure the kick plate.
The unit must be positioned accurately over the air ducts to ensure optimum airflow.
Ducting Box
Air Ducting
2
3
4
Air Flow
Air Flow
Align duct with
rear cut out
Rear Cut
Out
Содержание u2 40L
Страница 29: ...Borg Overström GB 29 Install Operation Manual ...
Страница 30: ...Borg Overström GB 30 Install Operation Manual ...
Страница 31: ...Borg Overström GB 31 Install Operation Manual ...