![Borg & Overstrom f4 Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/borg-and-overstrom/f4/f4_install-and-operation-manual_2788483003.webp)
GB
Parts to Assemble
The swan-neck installation instruction is as
following
:
Tap
Sink Top
Rubber
Washer and
Spacer
Washer
Nut
Pipe
Connection
Water Pipe
Installation
The following is a guide but the installer is responsible to comply with any local
regulations that may be applicable to this type of installation.
1. Install near to a convenient place to connect
to a mains pressure water supply of drinking
water quality and 220-240V/50Hz electrical
supply.
2. Avoid areas exposed to excessive heat,
humidity, rain or snow or direct contact with
water spray or splashing.
3. Avoid positions of direct sunlight or solar
heat.
4. Install only on flat, level and well supported
surfaces.