Steel wire
Copper joiner
Aluminum tube
Clevis
Add a rubber ring to the
clevis for insuring safety
Collar (5mm)
Collar (5mm)
Collar (5mm)
Two nacelle bottom covers are supplied for optional assembly of door,
which is decided by customers.Hardware package is not included.
TP Screw (2.3x12mm)
6
TP Screw (2.3x12mm)
Collar 4mm 3
4
Wooden Block
(25x15x13mm)
2
7
Collar (5mm)
Wheel (90mm)
Wooden supporter
(41.5x28x26mm)
Landing gear(5mm)
2
1
8
TP Screw (3x20mm )
Landing gear straps
2
Gear door
2
1
Landing gear (5mm)
1
Wheel (75mm)
Wooden supporter
(46x28x14mm) 1
4
TP Screw (2.6x14mm )
TP Screw (3x20mm)
Wooden Block
TP Screw (2.6x14mm)
Collar (5mm)
Wooden supporter
Collar (5mm)
6
TP Screw (2.3x12mm)
1
Ally nose arm
Epoxy the fixed laning gear to main wing.
Install the wheel to the nose gear.
Epoxy the fixed nose landing gear to the fuselage.
Trim the nacelle bottom cover and assemble it
with TP screws.
Installl the wheel and gear door to the landing gear.
65
66
67
68
69
13
65
Accessory list for the coming installation steps.
: 4-cycle .120
15
"
X7
Spinner nut
6
(with 9 servos),
6
6
6 channel radio for aiplane is highly recommended for this model.
Warning
Remove the covering with proper
pressure to cut through only the covering itself.Otherwise,
cutting down into the balsa structure may weaken the
model part and cause accident.
The pre-covered film on ARF kits may wrinkle due to
variations of temperature.Smooth out as explained right.
Pre-cover the covering with clean cloth!
Start at low setting. Increase the setting if
necessary.If it is too high,you may damage
the film.
Iow setting
with cover(cloth)