![BONAIRE 1200C Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/bonaire/1200c/1200c_installation-operation-and-maintenance_2786459007.webp)
I
NSTALLATION
,
O
PERATION
&
M
AINTENANCE
Unit Installation
D
UCTWORK
S
YSTEM
It is essential that water cannot enter the building as
a result of inadequate sealing (caulking or flashing) of
the fixings, the ductwork system, system pipes and
wiring.
All duct designs and airflows must be
calculated by a qualified air conditioning
consultant or contractor in accordance with
normal good ducting practices.
Discharge duct design critical to the air
performance of the product. See diagram
below.
Where flexible ductwork is used, all bends
must have a minimum radius of 1.5 times
the diameter. All joins must be taped
airtight.
The last bend to each ceiling register
must be a smooth radius so that airflow is
even into the room.
Содержание 1200C
Страница 5: ...INSTALLATION OPERATION MAINTENANCE Unit Installation DUCT CONNECTION DETAILS B18 B23 36 ...
Страница 8: ...INSTALLATION OPERATION MAINTENANCE Water Connections WATER CONNECTIONS UNIT BASE LAYOUT B18 B23 ...
Страница 9: ...INSTALLATION OPERATION MAINTENANCE Water Connections B33 B36 ...
Страница 14: ...INSTALLATION OPERATION MAINTENANCE Electrical Connections Three Phase B36 Page 14 ...
Страница 15: ...INSTALLATION OPERATION MAINTENANCE Electrical Connections Variable Speed Single Phase B18 B23 Page 15 ...
Страница 28: ...Manufactured by Climate Technologies ABN 13 001 418 042 www climatetechnologies com au P N 1 M00 05 915 E ...