![BONAIRE 1200C Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/bonaire/1200c/1200c_installation-operation-and-maintenance_2786459024.webp)
I
NSTALLATION
,
O
PERATION
&
M
AINTENANCE
Warranty – Australia Only
Aged New Product Warranties
For a new product warranty to apply, a product needs to be purchased and installed within 3 years of the
manufacturing date by the original purchaser.
Product that is
aged as the result of extended storage or being used for
demonstrat
ion purposes, the following
warranty conditions will apply.
•
For
a
product that is
greater than 3
years
and less than 5 years
old from date of manufacture
the
statutory warranty
will
apply and any voluntary warranty originally supplied
will be
reduced by 1 year
•
For
a
product that is
greater than
5 years
of age
from date of manufa
cture, the statutory warranty will apply to
electrically functioning components only. All other components being cabinets, louvres, filters etc. will not be
covered by warranty.
WARRANTY ON REPLACEMENT PARTS:
Parts replaced under warranty are warranted for the balance of the original warranty period.
SERVICE CENTRES:
Only qualified service personnel should conduct any service work carried out on your ducted reverse cycle air
conditioning system. It is important that periodical service is carried out on your product to ensure your will
receive the efficiency benefits the product provides.
For Metro Service only ring the numbers below.
South Australia/
(08) 8307 5230
Northern Territory
New South Wales /
(03) 8795 2457
Australian Capital Territory
Western Australia
(08) 9454 1000
Victoria/Tasmania
(03) 8795 2456
Queensland
(03) 8795 2457
Page 24
Содержание 1200C
Страница 5: ...INSTALLATION OPERATION MAINTENANCE Unit Installation DUCT CONNECTION DETAILS B18 B23 36 ...
Страница 8: ...INSTALLATION OPERATION MAINTENANCE Water Connections WATER CONNECTIONS UNIT BASE LAYOUT B18 B23 ...
Страница 9: ...INSTALLATION OPERATION MAINTENANCE Water Connections B33 B36 ...
Страница 14: ...INSTALLATION OPERATION MAINTENANCE Electrical Connections Three Phase B36 Page 14 ...
Страница 15: ...INSTALLATION OPERATION MAINTENANCE Electrical Connections Variable Speed Single Phase B18 B23 Page 15 ...
Страница 28: ...Manufactured by Climate Technologies ABN 13 001 418 042 www climatetechnologies com au P N 1 M00 05 915 E ...