background image

Manuel du Praprietaire

Owner's Manual

Manuel di usa e manutenziane del

praprietaria

Eigner-Handbuch

Manual del Prapietaria

Tome

2 -

Volume 2

Teil

2 -

Tomo 2

LIRE ATIENTIVEMENT CE MANUEL AVANT MISE EN SERVICE DE VOTRE BOMBARD
CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR BOMBARD
LEGGERE ATIENTAMENTE

PRIMA DIINIZIARE IL MONTAGGIO DEL VOSTRO BOMBARD

VOR INBETRIEBNAHME IHRES BOMBARD VORLIEGENDES HANDBUCH AUFMERKSAM LESEN
LEER CUI DADO SAMENTE ESTE MANUAL ANTES DE PONER EN SERVICIO SU BOMBARD

Содержание AEROTEC 380

Страница 1: ...Tomo 2 LIRE ATIENTIVEMENT CE MANUEL AVANT MISE EN SERVICE DE VOTRE BOMBARD CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR BOMBARD LEGGERE ATIENTAMENTE PRIMA DIINIZIARE IL MONTAGGIO DEL VOSTRO BOMBA...

Страница 2: ...LUME1 DEALS WITH OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHN...

Страница 3: ...rotec floor to correct pressure 5 6 INFLATION I PRESSURE 5 install the seat V ASSEMBLY OF EQUIPMENT _ 6 finish inflation of the boat to the correct pressure INFLATION I PRESSURE A CAUTION Aerotec infl...

Страница 4: ...to correct pressure 3 Finish inflation of the tube to correct pressure 4 Tighten the buckles We recommend that you leave the Aerotecfloor in the boat when folding However to clean perfectly the boat...

Страница 5: ...flow is feeble but the pump can reach hinll pross 0 To activate the standard valves into INFLATION position Free the valve insert from its protection Unscrew the valve cap Screw the valve support ont...

Страница 6: ...ATE THE MAIN TUBE THERE WOULD BE A RISK OF BURST Inflate the main buoyancy tube first with gear lever in position until it becomes difficult to operate then put the gear lever to position and inflate...

Страница 7: ...wllllJolll drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN unlil you 1 Flintll lo 1pressure due to the difference in temperatures Therefore a loss of pr ssuH at 1111 ond 01 tile day when...

Страница 8: ...the main buoyancy tube A fold the cones onto the transom then roll up the boat around the transom C Start again if you feel there is still some air left in the tubes r i 1 Stow the boat in its bag as...

Страница 9: ...2 rue Maurice Mallet 92130 Issy les Moulineaux FRANCE Tel 33 01 41 23 23 23 Fax 33 01 46 48 83 85...

Отзывы: