BOMAX BMGE-520 Скачать руководство пользователя страница 3

 

www.bomaxengineering.com

 /

[email protected]

 / BM-GE-520 Owner’s Manual Ver.01-2009   

Page 3 

 

 

  Spare parts must comply with the technical requirements specified by the   

     manufacturer. This is always guaranteed if original spare parts are used. 

 

 

  To perform maintenance work correctly it is imperative to be equipper with the proper   

     tools for the task in question. 

 

 

  

The location and the operation of fire extinguishers must be made known on 

      each work site!                                                     

 

  Take note of the facilities for reporting of, and fighting fires!                  

 

1.2  Personnel selection and qualification 

 

     Fundamental duties: 

      

     Work on the machine may only be undertaken by trained personnel. 

      

     Only trained personnel may be employed. Note the statutory minimum age! Specify clearly 

the responsibilities of personnel for operation, setting up, servicing and maintenance work! 

      

     Make sure that only authorized personnel operate or work on the machine! 

 

Define responsibilities of the machine operator, with regard to traffic safety regulations, and 

inform him not to take instructions from third parties who may not be complying with the 

local safety requirements! 

 

Personnel who are being trained to operate equipment, may only use the machine under 

constant supervision of an experienced person! 

 

 

 

Work on electrical equipment, may only be undertaken by a skilled electrician or   

by trained persons under the supervision of a skilled electrician

in according with   

the local electrical engineering regulations                              

   . 

 

1.3  Safety precautions applicable to some operating sequences 

      

DO not allow any method of working that impairs safety! 

 

Recognised official procedures have to be used, to ensure the machine is operated in a safe, 

and best conditions. 

 

 

  

Only operate the machine when all safety devices, and related safety equipment, 

      are present and operational!       

                                                  

 

Check the machine visually for any damage and defects at least once a day! 

 

Содержание BMGE-520

Страница 1: ...er bomaxengineering com BM GE 520 Owner s Manual Ver 01 2009 Page 1 OPERATION MANUAL BMGE 520 Grinding polishing Machine Owner s Manual PERFORMANCE EFFICIENT RELIABLE Your Model ____________________ Y...

Страница 2: ...ad the Operating Instructions before starting work in particular the Safety Instructions chapter To read these instructions after work as commenced is too late This particularly applies to incidental...

Страница 3: ...sure that only authorized personnel operate or work on the machine Define responsibilities of the machine operator with regard to traffic safety regulations and inform him not to take instructions fro...

Страница 4: ...y extension cables that are used for extending the main cable that are sized and marked in according with the overall power consumption of the machine and the valid VDE guidelines 1 4 Special work wit...

Страница 5: ...nections that are loosened during servicing and maintenance work If safety devices need to be taken off or dismantled during service and repair these safety devices must be reinstalled and inspected i...

Страница 6: ...ulations Use only extension cables that are used for extending the main cable that are sized and marked in accordance with the overall power consumption of the machine and the valid VDE guidelines The...

Страница 7: ...To remove undulated concrete surface To prepare the surface for coating To polish the surface To remove the coating defects To remove glue residue To remove the coating from wood floors To renovate wo...

Страница 8: ...efore switch on the machine operator should connect the electrical wire to plug The plug locates on the back of the control panel 3 5 Add water and check water release valve Operator should add the wa...

Страница 9: ...r can rotate the wheel to adjust the working height to meet the running request 3 7 Check horizontal level Operator must check the machine horizontal level before running the machine to gurrante the g...

Страница 10: ...ollector units with the flexible hose Use hose clamps at the connectors Make sure the dust bin of the dust collector units is empty If problem with the current supply arise during the assembly or the...

Страница 11: ...d by the operator 4 4 Switched off the machine Rotate the speed adjust button to decrease the speed to 0 RPM then press the stop switch button In case of emergency or operating trouble like vibrations...

Страница 12: ...There are 4 carry bars with BM GE 520 machine it is tighten on the handle If you need lift the machine just put the bar in the hole on the machine 5 2 Before storage Clean the machine and cover it wi...

Страница 13: ...ng clean the coupling worn or broken the gear in gear box check the gear replace the gear if necessary reduced or no grinding performance grinding tools have reached maximum wear replace the worn part...

Отзывы: