8
Dimensions in mm
Preparing the worktop for installation of the hob
CAUTION:
Before cutting secure the outer cutout edge with wide
adhesive tape to avoid traces of jigsaw on the work-
top.
The worktop must be leveled horizontally and be
sealed on the wall side against overflowing liquids
or moisture.
The hob must be surrounded by min. 50 mm work
surface.
The cut surfaces (cutout edges) must be sealed
with special varnish, silicone rubber or cast raisin
to prevent swelling caused by humidity.
The worktop in the area of the cutout must be
thoroughly cleaned and dried.
Worktop cutout
Prepare the cutout of the worktop according to the di-
mensional drawing.
Dimensions in mm
Installing the hob
NOTE:
To avoid damage, place the hob with the top of the
cooking surface on a padded base.
First check the factory fitted hob seal at the hob
frame to the integrity and the proper fit.
Attach the enclosed retaining clamps with the
screws in the provided holes laterally of the hob.
Place the hob according to the hob drawing under
"Appliance Overview"
and with the connecting ca-
ble first centrally into the prepared cutout of the
worktop.
Make sure that the distances to the cutting are
equal on all four sides and that the seal is resting
on the worktop.
Installing the oven
Put the appliance with the connecting cable first
into the prepared cabinet a bit.
Do the connection to the hob as well as to the
mains, see
"Electrical connection"
.
Insert the oven into the cabinet opening com-
pletely. Make sure that the cables do not re-
stricted (bent, squeezed or twisted).
Attach and secure the oven by using the supplied
screws on the side walls of the cabinet.
2x mounting
holes are located
left and right in
the door frame.
Содержание EHBC 7930
Страница 1: ...HOUSEHOLD ELECTRIC OVEN SET EHBC 7930 Instruction Manual...
Страница 22: ...22...
Страница 23: ...23...
Страница 24: ...24 C Bomann GmbH www bomann germany de Made in P R C Stand 08 2021...