![Bomag BW 213 D-4 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/bomag/bw-213-d-4/bw-213-d-4_operating-instructions-maintenance-instructions_2785497053.webp)
Maintenance
BOMAG
53
BW 213 D-4
5.4
Running-in instructions
The following maintenance work must be per-
formed when running in new machines or
overhauled engines:
!
Caution
Up to approx. 250 operating hours check the
engine oil level twice every day.
Depending on the load the engine is subjected
to, the oil consumption will drop to the normal
level after approx. 100 to 250 operating hours.
After a running-in time of 30 minutes
l
Retighten the V-belt
After 50 operating hours
l
Retighten bolted connections on intake and
exhaust tubes, oil sump and engine mounts.
l
Retighten the bolted connections on the ma-
chine.
l
Retighten all wheel fastening screws with the
specified tightening torque.
l
Oil change vibration bearings
l
Oil change in drive axle
l
Oil change in wheel hubs
After 500 operating hours
l
Oil change vibration bearings
Содержание BW 213 D-4
Страница 2: ......
Страница 7: ...BOMAG 7 BW 213 D 4 1 Technical Data...
Страница 11: ...BOMAG 11 BW 213 D 4 2 Safety regulations...
Страница 18: ...Safety regulations BOMAG 18 BW 213 D 4...
Страница 19: ...BOMAG 19 BW 213 D 4 3 Indicators and Controls...
Страница 20: ...Indicators and Controls BOMAG 20 BW 213 D 4 Fig 5...
Страница 30: ...Indicators and Controls BOMAG 30 BW 213 D 4 Constant end of compaction...
Страница 31: ...BOMAG 31 BW 213 D 4 4 Operation...
Страница 46: ...Operation BOMAG 46 BW 213 D 4...
Страница 47: ...BOMAG 47 BW 213 D 4 5 Maintenance...
Страница 95: ...BOMAG 95 BW 213 D 4 6 Trouble shooting...
Страница 99: ...Trouble shooting BOMAG 99 BW 213 D 4...
Страница 100: ...Trouble shooting BOMAG 100 BW 213 D 4...
Страница 101: ......
Страница 102: ......