background image

                                                                                  

 
 

 

 

Solar Energy Australia  

 

              

 

 

 
Doc No SPN-1601A     Rev0803 

 

 

 

         Page  7 

Bolero Manual 

Off   On 
    S/By 

AC Status 

Low DC 

Overtemp 

200mm 
minimum 
 
clearance 

Off   On 
   S/By 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 

 

 
 
 
 
 

4. Start-up 

Procedure 

a) 

Check battery condition and voltage are within specifications. 

b) 

Ensure the DC circuit breaker is set to the OFF (down) position. 

c) 

Plug in the AC connector, but do not switch ON. 

d) 

Switch DC circuit breaker to the ON (up) position. 

e) 

If all is well the AC status LED will be flashing green. This indicates all parameters are normal and the unit is in Standby 

waiting for an AC load to be switched ON. 

f) 

Switch ON AC.

 

 

 

 

 RS232 

+

       12VDC         

-

 

300mm minimum 
clearance 

Chassis earth 

Содержание SEAP-12-800

Страница 1: ...ture and Adjustment Page 9 Adjusting Load Sensitivity Troubleshooting Page 10 How long will my battery last Page 11 Technical Data Page 12 Mounting Specifications Solar Energy Australia Pty Ltd ACN 08...

Страница 2: ...and or service please do not hesitate to contact us to discuss your thoughts Remember As soon as your Solar Energy Australia inverter has been installed please complete and return your warranty card...

Страница 3: ...are strictly adhered to Failure to do so will void your warranty Units which are to be permanently used within 1km of the coast should have the marine version of our product this will help to avoid co...

Страница 4: ...Ah Ampere Hours This is the amount of energy a battery can store In theory this means that a 200 Ah battery could supply 1 Amp for 200 hours Alternatively if an appliance draws 2 Amps for 4 hrs then...

Страница 5: ...solid surface capable of withstanding temperatures of 60 C Allow a cooling space of at least 200mm all around the inverter Placing the inverter in a cupboard or small enclosure may reduce the availabl...

Страница 6: ...y a short distance from the inverter in order to obtain best results but not closer than 500mm A battery fuse must be installed no closer than 500mm from the battery to protect all wiring connected to...

Страница 7: ...n specifications b Ensure the DC circuit breaker is set to the OFF down position c Plug in the AC connector but do not switch ON d Switch DC circuit breaker to the ON up position e If all is well the...

Страница 8: ...the internal temperature has been reduced to a safe level Load Sense Feature and Adjustment Your Bolero inverter features a Standby circuit for automatic load sensing which allows the inverter to rema...

Страница 9: ...the amount of AC load on the inverter Inverter shuts down due to Over Temperature Your inverter will safely provide the output power as described in the technical data section in the conditions speci...

Страница 10: ...xample a 16 inch TV 67 Watts running on 130AH battery Note Use a figure of 20 if your battery voltage is 24V DC Only 50 of the batteries capacity will be used to allow it to recover How can I tell if...

Страница 11: ...no load AC ON 38A 34A DC Current draw at full continuous load 81A 49A DC Current draw maximum 250 160A Efficiency 10 of load 92 91 Efficiency 50 of load 92 92 Efficiency 90 of load 87 88 Peak Efficie...

Страница 12: ...Solar Energy Australia Doc No SPN 1601A Rev0803 Page 12 Bolero Manual 243 mm 229mm...

Отзывы: