4. Start-up
Procedure
a)
Check battery condition and voltage are within specifications.
b)
Ensure the DC circuit breaker is set to the OFF (down) position.
c)
Plug in the AC connector, but do not switch ON.
d)
Switch DC circuit breaker to the ON (up) position.
e)
If all is well the AC status LED will be flashing green. This indicates all parameters are normal and the unit is in Standby
waiting for an AC load to be switched ON.
f)
Switch ON AC.