0006 00
BOH-PM-01-2
Chapter 2 Rev. 1.03
0006 00-1
OPERATOR INSTRUCTIONS
FPU
®
SYSTEMS OPERATION MANUAL
(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST)
BOH CONTAINERIZED LATRINES
BOH FPU Field Pack-up Units
Operation of the Containerized Latrine
INITIAL SETUP: Reference
Initial set-up None
Maintenance Level
Personnel Required
Operator/Crew
One (plus one supervisor)
Latrine Operation
NOTE
The ground rod and strap is stored next to the toilet and the city water
shutoff valve is stored in the vanity of the first compartment (1) electrical
connection end of the container.
WARNING
The electrical ground must be established first to prevent electrical shock to personnel.
WARNING
Always establish a safe footing operational site. The interior floor should be kept clean and dry.
1
First Latrine
Compartment