BOH Enviromental FPU Series Скачать руководство пользователя страница 5

0005 00

 

 

 

BOH-PM-01-2 
Chapter 2 Rev. 1.03 

0005 00-3 

 

WARNING 

 
 
  

 
 

Ensure all circuit breakers and the power source are switched off before making electrical 
connections. Ensure the proper 120 VAC electrical cable connectors are installed by a 
certified electrician (Army MOS 21R). 

 

Setup Procedures 

1.  Set latrine unit on a level surface. Unit must be level for plumbing discharge to operate 

properly. 

2.  Ensure all sink, urinal and toilet water valves are in the full off position. 
3.  Connect sewage discharge line to local sewage system. 
4.  Remove grounding rod from its storage location (See Chapter 2 page 0006 00-1) and 

connect to grounding lug located below the unit’s load center.  (See Chapter 2 page 0006 
00-2) Rod should be inserted fully into the ground. Install the check valve and shutoff 
valve and connect city water line to local water source. (See chapter 2 page 0006 00-2)  

5.  Ensure all breakers located in the unit’s load center are in their off position. 
6.  Open load center door and remove breaker cover to provide access to main breaker. 
7.  Connect electrical power from local power source (ensure electrical lines from the power 

source is in its off position). 

CAUTION 

This system is a 120/240 volt, 1 phase, 60 HZ system.  Ensure 120 volt only is 
connected to line one and 120 volt only to line two (see label attached to the load 
center for connection instructions).  Connection of incorrect voltage may cause 
damage to the unit’s electrical system. 
 

8.  Turn power on from local power source. 
9.  Once electrical power is connected, it is recommended that the unit be tested for proper 

voltage. 

10.  Re-install breaker cover. 
11.  Turn on main breaker. 
12.  Turn on remaining breakers. 
13.  Turn on all sink, urinal and toilet water valves. 
14.  Inspect sinks, urinals and toilets for proper function. 
15.  Run water until all air is removed from the water lines. 
16.  Remove all toilet tank covers from their storage bags and install over the toilet tanks. 

 

WARNING 

 
 
 
 
 

 

Always establish a safe footing operational site. The interior floor should be kept dry and clean. 

 

 

 

Содержание FPU Series

Страница 1: ...01 2 2016 BOH Environmental LLC Chapter 2 Rev 1 03 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED LATRINES BOH FPU Field Pack up Units CHAPTER 2 OPERATOR INSTR...

Страница 2: ...BOH PM 01 2 Chapter 2 Rev 1 03 This page was intentionally left blank...

Страница 3: ...te Requirements WARNING The Latrine must be operated on level ground To maintain control consider the ground surface conditions for adequate traction such as mud snow ice sand CAUTION Flood plain cond...

Страница 4: ...ar overhead when loading unloading the BOH Containerized Latrine CAUTION The Containerized Latrine most be placed on a level surface of a platform pillars or ground surface to operate properly and pre...

Страница 5: ...ad center are in their off position 6 Open load center door and remove breaker cover to provide access to main breaker 7 Connect electrical power from local power source ensure electrical lines from t...

Страница 6: ...2 Chapter 2 Rev 1 03 0005 00 4 Shut Off Valves 1 City Water shutoff valve and check valve 1 2 Left and right sink shut off valve 2 3 Urinal shut off valve 3 4 Toilet shut off valve 4 Closed Closed 2 3...

Страница 7: ...ning water trapped in the water lines 4 Disconnect sewage discharge line from local sewage system 5 Turn off all sink faucets close all sink water valves close urinal water valves and close all Latrin...

Страница 8: ...ot ISO certified or CSC Safety Approved When transporting or storing never stack the containerized latrine units The container structure is not designed to support additional containers Failure to com...

Страница 9: ...el Personnel Required Operator Crew One plus one supervisor Latrine Operation NOTE The ground rod and strap is stored next to the toilet and the city water shutoff valve is stored in the vanity of the...

Страница 10: ...ge 0006 00 1 2 Ensure the electrical supply is still connected and operational 1 3 Check the external GFCI outlet and GFCB breakers are reset 1 and 2 4 Check fresh water connection 3 open shutoff valv...

Страница 11: ...ION The Containerized Latrine must be placed on a level surface of a platform pillars or ground surface to operate properly and prevent waste water backups Black Water is discharged by gravity Electri...

Страница 12: ...0006 00 BOH PM 01 2 Chapter 2 Rev 1 03 0006 00 4 Containerized Latrine Electrical Layout...

Страница 13: ...y a certified electrician should be permitted to remove and repair the electrical components of the system Two Tube Fluorescent Light Fixtures 1 GFCI Protected Interior Electrical Outlets 2 Weather Pr...

Страница 14: ...0006 00 BOH PM 01 2 Chapter 2 Rev 1 03 0006 00 6 Air Ventilation System Air Exhaust Vents 1 Fresh Air Intake 2 Interior Fan 3 Interior Exhaust Fan switch 4 END OF WORK PACKAGE 1 1 2 2 3 4...

Страница 15: ...e FPU modules 2 Secure all accessories and container during extremely harsh rain Operation in Extreme Heat WARNING Protective gloves should be worn when handling metal parts in high temperatures Failu...

Страница 16: ...BOH PM 01 2 Chapter 2 Rev 1 03 This page was intentionally left blank...

Отзывы: