BOH Enviromental FPU Series Скачать руководство пользователя страница 15

0007 00

 

BOH-PM-01-2 
Chapter 2 Rev. 1.03 

0007 00-1 

OPERATOR INSTRUCTIONS  

 

FPU

®

 SYSTEMS OPERATION MANUAL 

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) 

BOH CONTAINERIZED LATRINES  

BOH FPU Field Pack-up Units 

 

 

OPERATION UNDER UNUSUAL CONDITIONS 

 

 

This work package provides instructions for the operation of the FPU modules under unusual 
conditions.  These include adverse weather, nuclear, biological and chemical attack, and 
emergency blackout conditions. 

 

Operation in Rain and/or Mud 

 

1.  Provide an adequate drainage ditch to prevent standing water around the FPU modules. 
2.  Secure all accessories and container during extremely harsh rain. 

 
Operation in Extreme Heat

 

WARNING 

 
 
 
 

 

Protective gloves should be worn when handling metal parts in high 
temperatures.  Failure to wear gloves may result in burning or blistering 
of the skin upon contact. 

 

Operation in Snow, Ice, or Extreme Cold 

 

WARNING 

 
 

 
 

 

In extreme cold, do not touch metal parts with bare hands. 

                Severe skin damage may result. 

 
 
 
 
 
 

Fording  

 

The Containerized Latrines are not watertight.  They should never be submerged in any depth of 
water, as material damage may result.  When mounted on a trailer or truck, hard-bottom water 
crossings should be no deeper than approximately two feet.  When in doubt, refer to Unit 
Standard Operating Procedures. 

 

END OF WORK PACKAGE

 

Содержание FPU Series

Страница 1: ...01 2 2016 BOH Environmental LLC Chapter 2 Rev 1 03 FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH CONTAINERIZED LATRINES BOH FPU Field Pack up Units CHAPTER 2 OPERATOR INSTR...

Страница 2: ...BOH PM 01 2 Chapter 2 Rev 1 03 This page was intentionally left blank...

Страница 3: ...te Requirements WARNING The Latrine must be operated on level ground To maintain control consider the ground surface conditions for adequate traction such as mud snow ice sand CAUTION Flood plain cond...

Страница 4: ...ar overhead when loading unloading the BOH Containerized Latrine CAUTION The Containerized Latrine most be placed on a level surface of a platform pillars or ground surface to operate properly and pre...

Страница 5: ...ad center are in their off position 6 Open load center door and remove breaker cover to provide access to main breaker 7 Connect electrical power from local power source ensure electrical lines from t...

Страница 6: ...2 Chapter 2 Rev 1 03 0005 00 4 Shut Off Valves 1 City Water shutoff valve and check valve 1 2 Left and right sink shut off valve 2 3 Urinal shut off valve 3 4 Toilet shut off valve 4 Closed Closed 2 3...

Страница 7: ...ning water trapped in the water lines 4 Disconnect sewage discharge line from local sewage system 5 Turn off all sink faucets close all sink water valves close urinal water valves and close all Latrin...

Страница 8: ...ot ISO certified or CSC Safety Approved When transporting or storing never stack the containerized latrine units The container structure is not designed to support additional containers Failure to com...

Страница 9: ...el Personnel Required Operator Crew One plus one supervisor Latrine Operation NOTE The ground rod and strap is stored next to the toilet and the city water shutoff valve is stored in the vanity of the...

Страница 10: ...ge 0006 00 1 2 Ensure the electrical supply is still connected and operational 1 3 Check the external GFCI outlet and GFCB breakers are reset 1 and 2 4 Check fresh water connection 3 open shutoff valv...

Страница 11: ...ION The Containerized Latrine must be placed on a level surface of a platform pillars or ground surface to operate properly and prevent waste water backups Black Water is discharged by gravity Electri...

Страница 12: ...0006 00 BOH PM 01 2 Chapter 2 Rev 1 03 0006 00 4 Containerized Latrine Electrical Layout...

Страница 13: ...y a certified electrician should be permitted to remove and repair the electrical components of the system Two Tube Fluorescent Light Fixtures 1 GFCI Protected Interior Electrical Outlets 2 Weather Pr...

Страница 14: ...0006 00 BOH PM 01 2 Chapter 2 Rev 1 03 0006 00 6 Air Ventilation System Air Exhaust Vents 1 Fresh Air Intake 2 Interior Fan 3 Interior Exhaust Fan switch 4 END OF WORK PACKAGE 1 1 2 2 3 4...

Страница 15: ...e FPU modules 2 Secure all accessories and container during extremely harsh rain Operation in Extreme Heat WARNING Protective gloves should be worn when handling metal parts in high temperatures Failu...

Страница 16: ...BOH PM 01 2 Chapter 2 Rev 1 03 This page was intentionally left blank...

Отзывы: