BOGE Operating instructions for C 16 N...C 30 N, C 16 F N...C 30 F N series screw compressors
Page 33
Installation
3.5
Commissioning
Rated voltage
The data of your mains (operating voltage, control voltage, type of current, fre-
quency, ...) must coincide with the data on the type plate on the switch cabinet.
In the event of deviations, please contact the BOGE service or your supplier.
Please see "Technical Data" for layout of mains fuse.
Connecting the leads
–
Check to ensure that all terminals in the switch cabinet are firmly tight-
ened. If necessary, retighten the screw connections.
–
Guide the lead cable through the PG screw connection.
–
Connect the leads L1, L2, L3, N, Pe (PEN) firmly to the power supply
terminal. A clockwise rotational field must be created.
–
Retighten the electrical connections after the first 50 operating hours.
Never omit a single safety step! Otherwise, you will risk injuries due to restart-
ing, electric shock or self-releasing parts.
3.5 Commissioning
WARNING: Risk of injury!
Prior to any work on the compressor:
–
Press Emergency Stop button, open mains disconnecting device and
secure with lock out tag out.
–
Check to ensure that all current carrying machine parts are voltage free.
–
Depressurize all areas under pressure.
WARNING!
When the automatic restart (Auto-Restart) is activated, the compressor will
start automatically following a power loss.
Prerequisite: The net pressure is lower than the set switch-on pressure.
NOTICE!
We recommend the drawing up of a commissioning certificate in which the
test results during the commissioning process can be listed up.
WARNING: Risk of injury!
The commissioning may only be carried out by experienced and authorized
qualified personnel!
Always wear protective gloves when working on the compressor to avoid
bruising of fingers or hands while opening or closing components!