7
8L
8R
10
10
10 10
9
1
19
Step 5
Turn the main frame back again now so that the front support tube is on the floor.
Pull out the ball pin (35) from the main frame and unfold the main frame. Then insert the
ball pin (35) to the main frame again for fixation.