5
Assembly
4. UPRIGHT POST INSTALLATION
4.1
Lift up the Upright Post (A02) and connect the Cable I (D17 and D07) from Upright Post to the
Cable II (D18 and D08) from Main Frame (A01). then slide the extra length of cables into opening
hole of Main Frame (A01)
4.2
Slide the wires into the opening hole of Main Frame (A01) carefully and use
Four
M8 Screws
(B05) by fingers first for aligning the punched holes and threaded holes.
[Tighten screws with the Hex Tool with Phillips Screw Driver provided.]
Attention:
Do not pinch cables.
5. ADJUSTING THE ADJUSTABLE FOOT PADS
5.1
Adjust the Adjustable Foot Pads (C05) on the Main Frame (A01) as needed to level the Seated
elliptical trainer
5.2
The Seated elliptical trainer has to be leveled to prevent from wobble or shaking during the
exercise.
[Tighten screws with the Hex Tool with Phillips Screw Driver provided.]
6. UPPER HANDRAIL TUBE INSTALLATION
6.1
Assemble the Upper Handrail Tube (A12/A13) into the Handrail Arm (A08/A09) with
Two
M8
Bolts (B06),
Two
M8 Curve Washers (B07) and
Two
M8 Nylon Nuts (B08).
6.2
Refer above step to assemble left side part..
6.3
Connect all connectors (D05/D06) from L/R Upper Handrail (A12/A13) to the matching
connectors (D10/D11) from Handrail Arm (A08/A09)
[Tighten screws with the Hex Tool with Phillips Screwdriver provided
.]
Attention:
Do not pinch cables.
C05
A01
B05
D06
D11
D05
D10
A13
A12
A08
A09
B06
B07
B08
Содержание SCT400g
Страница 1: ...SCT400g Seated Elliptical Trainer ...
Страница 26: ...Memo ...
Страница 27: ...Memo ...
Страница 29: ......