11
STEP 5 INSTALL TOP CABLE
Make certain long Pin Bolt is inserted completely through both holes in the pulley bracket.
Failure to do so will result in improper alignment and the pulley will rub on steel.
Assemble cables and Pulleys simultaneously
1. Insert the threaded end of Top Cable (66) into slot in front of Top Frame (2), over pulley
T1 and pulley T2 mounted on the Top Frame (2), using one 3/8" X 109.5L Flat Pin Bolt
(118) and one M6 X 12L Male Screw (124) each.
2. Route cable down and around pulley T3. Route cable around pulley T4 you will mount
on Main Frame (1) using one 3/8" X 30.5L Flat Pin Bolt (122), entering to the underside,
exiting on top, as shone in Fig STEP 2-1. Continue routing around pulley T5 {right side
pulley mounted in Press Arm Support (9)}, entering on top, exiting on bottom, as shown
in Fig STEP 2-2.
3. Route cable over pulley T6 mounted in the slot in the Main Frame (1) using one 3/8" X
109.5L Flat Pin Bolt (118) and one M6 X 12L Male Screw (124). Continue routing down
in front of pulley T7 mounted to rear of Main Frame (1) using one 3/8" X 30.5L Flat Pin
Bolt (122) and one M6 X 12L Male Screw (124). Route down and around pulley T8
mounted in the closed end of the Adjustable Pulley Block (21) using one 3/8" X 30.5L
Flat Pin Bolt (122) and one M6 X 12L Male Screw (124). The Adjustable Pulley Block
(21) does not attach to the frame, it dangles.
4. Route cable up and over pulley T9 mounted on Top Frame (2) and down around pulley
T10 mounted at top of Double Pulley Block (22), using one each 3/8" X 30.5L Flat Pin
Bolt (122), and one M6 X 12L Male Screw (124).
5. Run cable up and over pulley T11, then down and around pulley T12 mounted to the
Single Pulley Block (24) using one each 3/8" X 30.5L Flat Pin Bolt (122) and one M6 X
12L Male Screw (124). The Single Pulley Block (24) attaches to the frame extension if
you have not purchased the optional leg press attachment. If you have purchased the
optional leg press attachment, please flip the Single Pulley Block (24) upside down and
refer to the leg press assembly manual.
6. route cable up and over pulleys T13, and T14 mounted in the Top Frame (2) using one
3/8" X 30.5L Flat Pin Bolt (122) and one M6 X 12L Male Screw (124) for each. Then
run the cable down through the looped end of the Selector Pin (59) lanyard and screw
the threaded end of the cable into the Top Plate (46) about half way down. The
threaded end of the cable is an adjustment point, but should always have at least one
third of the threads screwed into the Top Plate (46). When all cables are strung and
cables are adjusted, make sure to tighten the jam nut.
TOP CABLE (66)
Threaded End
Ball End