Product Assembly - RFT - STEP 7g, 7h, 7i
45
S
TEP 7g:
Preassembly of the Selector Pin (F738 Parts)
Attach the
Selector Pin w/ Lanyard (225)
over the Pulley Block w/ shaft
1/2“- Assembly (211-ASM) using:
●
One NUT, Hex 1/2" (269)
S
TEP 7h:
Installation of the Selector Rod
(F738 Parts)
Attach the
Selector Rod, 19 holes (233)
into the
base of the Top Plate - Assembly (226-ASM). Line
up the threaded hole and attach using:
●
One BOLT, Recessed Round Head 7/16” x 1-3/4“
(265)
●
Tighten down to Torque Specs 30 ft-lbs +/- 3 lbs.
Recommended Tool
3/8 ALLEN WRENCH
S
TEP 7i:
Installation of the Pulley Block (F738 Parts)
Attach the
Pulley Block w/ Shaft 1/2“ OD - Assembly
to the Top
Plate - Assembly (226-ASM) down to max 1” of threads. See image
below.
Содержание F738
Страница 11: ...Weight Stack Ratios RFT F738 11...
Страница 63: ...Product Assembly RFT STEP 15 Weight Stack Stickers Installation 63...
Страница 69: ...Product Assembly RFT Routine Schedule 69...
Страница 70: ...Product Assembly RFT General Cable Inspection 70...
Страница 71: ...Product Assembly RFT Lubrication Maintenance 71...
Страница 72: ...Product Assembly RFT Strength Cable Wear Indicators 72...
Страница 75: ...Detailed Parts Exploded View F738 1 of 2 75...
Страница 76: ...Detailed Parts Exploded View F738 2 of 2 76...
Страница 83: ...This page intentionally left blank...
Страница 84: ......