Cable Pull Station
13
STEP 2 Assemble Main Frame
IMPORTANT
If you have 19 weight plates, DO NOT install the two stack spacers (24). See figure 1 & 2 below.
1. Refer to figure 1 and 2. If you have 14 weight stack plates (16), install the weight stack spacers (24) onto
each guide rod.
2. Slide two rubber donuts (17) onto one end of each guide rod (7). Slide each weight plate (16) over the
guide rods (7). Make sure that each plate is oriented with the selector hole opening on the bottom and
facing forward.
3. Attach the top plate (15) to
the selector rod (14) using the
top plate bolt (51), TIGHTEN.
Thread the double pulley hol-
der (12) into the selector rod
(14) with 10 full turns. Slide the
top Plate (16) and the selector
rod (14) over the guide rods
(7) as shown.
4. Remove the four pre-instal-
led 3/8“ nylon nuts (59) and
3/8“ washers (53) from the two
base frames (2). Attach the
right support frame (8R) and
the left support frame (9L) to
the main frame (1) and two
curved washers (57), four 3/8“
washers (53), and six 3/8“ nylon
nuts (59) as shown.
5. Install the cable height adjus-
ter (4) onto the top of the front
upright (5). Install each stopper
(35) with a M8 X 5/8“ Inner Hex
Screw (47) at the top and bot-
tom of the front upright (5) as
shown. Tighten the M8 X 5/8“
Inner hex screws (47).
Содержание Cable Pull Station
Страница 1: ...Assembly and operating instructions SW CFT Cable Pull Station 2 persons SWCFT 01 01 ...
Страница 2: ...Cable Pull Station 2 ...
Страница 11: ...11 ...
Страница 25: ...25 7 4 Exploded drawings ...
Страница 27: ...27 Notes ...
Страница 28: ...Cable Pull Station 28 Notes ...
Страница 29: ...29 ...
Страница 30: ...Cable Pull Station ...