![Body Solid smr1000 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/body-solid/smr1000/smr1000_owners-manual_2783015016.webp)
16
S T E P
4
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Wrench tighten all hardware in this step.
A.
Secure Weight Horns (D) and 50x170mm Support Plate (G) onto Side Frame (E) using:
Two 1 (M12x100 hex head bolt)
Four 8 (M12 washer)
Two 7 (M12 nylon lock nut)
B.
Repeat the procedure above to complete the weight horn installation.
C.
Connect Pull Up Bar (J) and both Pull Up Handles (K) to Cross Support (P) using:
Four 3 (M12x80 hex head bolt)
Eight 8 (M12 washer)
Four 7 (M12 nylon lock nut)
D.
Slide Rubber Donut (14) onto each Weight Horn (D).
7!2.).'
."9-0"%
-# ,(
."964&38&*()5
-# ,(
To avoid serious injury, Weight Horn Collars
must be used to lock the weight plates onto
the weight posts.
Failure to use Weight Horn Collars properly
may result in death or serious injury.
Addendum
!
WARNING
To avoid serious injury, Weight Horn Collars must be
used to lock the weight plates onto the weight posts.
Failure to use Weight Horn Collars properly may result
in death or serious injury.
For more information or to purchase a Weight Horn Collar visit
www.bodysolid.com
Addendum
!
WARNING
To avoid serious injury, Weight Horn Collars must be
used to lock the weight plates onto the weight posts.
Failure to use Weight Horn Collars properly may result
in death or serious injury.
For more information or to purchase a Weight Horn Collar visit
www.bodysolid.com