30
S T E P
5
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Wrench tighten ALL hardware at the end of Each Step. Some components may be
pre-assembled. Nylon lock nuts will not fully screw onto bolts, they must be wrench
tighten to fully go on.
5A.
Install Cable
(#88)
while installing three Large Pulleys
(#63)
and
Seven Small Pulleys
(#64)
on the Right Side of the Machine as shown
in Step 5 Drawing using:
1 - (#3) M10X95mm Hex Head Bolt
2 - (#5) M10X55mm Hex Head Bolt
7 - (#6) M10X50mm Hex Head Bolt
20 - (#50) M10 Flat Washer
10 - (#40) M10 Nylon Lock Nut
2 - (#72) Steel Bracket
5B.
Repeat the previous Step (5A) on the other side of the machine.
Содержание S2FT
Страница 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L v S2FT 112216 S2FT ...
Страница 21: ...45 21 N o t e s PCL Badge Location ...
Страница 23: ...S T E P 1 Above shows Step 1 assembled and completed 23 ...
Страница 25: ...S T E P 2 Above shows Step 2 assembled and completed 25 WA WA ...
Страница 27: ...27 S T E P 3 Above shows Step 3 assembled and completed WA WA ...
Страница 29: ...S T E P 4 Above shows Step 4 assembled and completed 29 ...
Страница 31: ...31 S T E P 5 Above shows Step 5 assembled and completed ...
Страница 33: ...33 S T E P 6 Above shows Step 6 assembled and completed ...
Страница 35: ...35 S T E P 7 Above shows Step 7 assembled and completed ...
Страница 36: ...36 S 2 F T E x p l o d e d V i e w ...
Страница 37: ...37 S 2 F T E x p l o d e d V i e w C o n t i n u e ...