22
S T E P
1
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware in this step. DO NOT wrench tighten unless instructed.
Some components may be pre-assembled. Nylon lock nuts will not fully screw onto
bolts, they must be wrench tighten to fully go on.
1A.
Attach two Long Metal Shrouds
(WC)
to two Weight Stack Frames
(WA)
using:
4 - (#10) M8X25mm Button Head Cap Screw
8 - (#51) M8 Flat Washer
4 - (#41) M8 Nylon Lock Nut
1.
Attach two Center Frames
(M)
to Weight Stack Frames
(WA)
using:
8 - (#8) M10X25mm Socket Head Cap Screw
8 - (#56) M10 Large Flat Washer
Содержание S2FT
Страница 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L v S2FT 112216 S2FT ...
Страница 21: ...45 21 N o t e s PCL Badge Location ...
Страница 23: ...S T E P 1 Above shows Step 1 assembled and completed 23 ...
Страница 25: ...S T E P 2 Above shows Step 2 assembled and completed 25 WA WA ...
Страница 27: ...27 S T E P 3 Above shows Step 3 assembled and completed WA WA ...
Страница 29: ...S T E P 4 Above shows Step 4 assembled and completed 29 ...
Страница 31: ...31 S T E P 5 Above shows Step 5 assembled and completed ...
Страница 33: ...33 S T E P 6 Above shows Step 6 assembled and completed ...
Страница 35: ...35 S T E P 7 Above shows Step 7 assembled and completed ...
Страница 36: ...36 S 2 F T E x p l o d e d V i e w ...
Страница 37: ...37 S 2 F T E x p l o d e d V i e w C o n t i n u e ...