10
Be careful to assemble all components
in the sequence they are presented.
20
S T E P
mm
Inch
Note:
All Pulleys in this step are 4 1/4” diameter.
Leave all pulley bolts hand tight until step 13 is completed.
A.
See Diagram 2. Install Pulley (A6) under Cable (66) and into Angled Vertical Frame (D) using:
One 43 (3/8” x 2 3/4” hex head bolt)
Two 15 (pulley spacer)
One 51 (3/8” nylon lock nut)
Cable (66) should be hanging down through the small arm sticking out of the Angled
Vertical Frame (D).
B.
See Diagram 1. Route Cable (66) through the top of the Double Pulley Holder (X).
Install Pulley (A7) using:
One 44 (3/8” x 1 3/4” hex head bolt)
One 51 (3/8” nylon lock nut)
C.
See Diagram 1. Route Cable (66) up through the hole in Top Frame (E), over pre-installed
Pulley (A8), and down through Top Weight Stack Frame (N) and toward weight stack.
D.
See Diagram 1A. The Metal Ball End of Cable (66) should be hanging just above the weight
stack. Remove Bolt (23) from Selector Rod Top Bolt (22), slide Metal Ball End of Cable (66)
through Selector Rod Top Bolt (22). Attach Cable End Shaft (38) and securely tighten
Allen Screw (39). Pull Cable (66) tight, so Cable End Shaft (38) fits securely inside Selector Rod
Top Bolt (22). Reinstall Bolt (23) in Selector Rod Top Bolt (22).
NOTE:
Make sure the Selector Rod Top Bolt (22) is threaded inside Selector Rod (21) at least
one half inch. Make sure Spring Lock Washer (24) is in place and wrench tighten Jam
Nut (25).
High Pulley Cable (66)
Ball Stop End
Metal Ball End
4270mm
14”
Содержание G3S
Страница 1: ...Body Solid A s s e m b l y I n s t r u c t i o n s ...
Страница 3: ...1 3 S T E P ...
Страница 5: ...2 5 S T E P ...
Страница 7: ...3 7 S T E P ...
Страница 9: ...4 9 S T E P ...
Страница 11: ...5 11 S T E P ...
Страница 13: ...6 13 S T E P ...
Страница 15: ...7 15 S T E P ...
Страница 17: ...8 17 S T E P ...
Страница 33: ...33 ...