Page 20
Step 4
Loop the Dynamic Belt over the Timing Pulley and
then route it beneath the two front Idler Pulleys.
Remove excess slack from the Belt Pully and Push
the Bell Everman Assembly down so that the belt is
meshed as shown.
The belt will not be
tight at this step in the
process. The belts will
be tightened in a later
step.
Содержание KL744
Страница 1: ...Page 1 Version 2 6 Mechanical System KL 744 MANUAL 5 of 8 ...
Страница 4: ...Page 4 Part Description Qty Photo H24 Adjustment Tool 1 Vacuum Shoe 1 Vacuum Shoe Retainer ...
Страница 13: ...Page 13 Step 2 Route the Servo Motor and Controller cable through the back of the Y Carriage Assembly as shown ...
Страница 29: ...Page 29 NOTE Proper orientation of the Drag Chain ends ...
Страница 34: ...Page 34 Step 3 Remove the upper tabs until you reach the bend ...
Страница 35: ...Page 35 Leave one tab on the front of the bend Leave three tabs on the back of the bend ...
Страница 48: ...Page 48 Step 2 Finish by routing the Y Home Switch wire down and through the Drag Chain ...
Страница 57: ...Page 57 Properly tightened belt with teeth fully engaged beneath the Idler Pulleys ...
Страница 62: ...Page 62 Plug the Router into the Extension Cord as shown Step 4 ...
Страница 67: ...Page 67 Lock the Brush Shoe Assembly in place by inserting the Shoe Retainer as shown Step 4 ...