Lift the battery up and out;
work it slightly back and forth
if it is difficult to remove.
Install the battery
Install the battery, making sure
to connect breather hose
5
.
Install battery retaining strap
4
.
Connect positive lead
3
first.
Then connect negative lead
2
.
Push cover
1
into position over
the battery positive terminal.
Install the centre trim panel
(
Setting clock (
Checking battery-acid
level
Check the acid level regularly
at intervals of approximately
three months.
Removing battery (
91).
Check the acid level at mark
1
.
Specified level, battery
acid
Between MIN and MAX
marks
If the acid level is below the MIN
mark:
Top up the battery acid with
distilled water to the specified
level.
8
92
z
ProCarManuals.com
Содержание G 650 GS Sertao
Страница 1: ...BMW Motorrad Rider s Manual G 650 GS Sertão The Ultimate Riding Machine ProCarManuals com ...
Страница 6: ...ProCarManuals com ...
Страница 10: ...1 8 z General instructions ProCarManuals com ...
Страница 12: ...2 10 z General views ProCarManuals com ...
Страница 14: ...2 12 z General views ProCarManuals com ...
Страница 28: ...3 26 z Status indicators ProCarManuals com ...
Страница 42: ...4 40 z Operation ProCarManuals com ...
Страница 66: ...7 64 z Accessories ProCarManuals com ...
Страница 98: ...8 96 z Maintenance ProCarManuals com ...
Страница 106: ...Mirror arm FR Valid Clamping piece mirror to clamping block M10 x 1 25 30 Nm 10 104 z Technical data ProCarManuals com ...
Страница 116: ...10 114 z Technical data ProCarManuals com ...
Страница 126: ...Item Odometer reading Date 11 124 z Service ProCarManuals com ...