Bmax Technology B-MAX 100 Скачать руководство пользователя страница 12

10 

Bmax Technology 

A Division of Elmec Group S.r.l. 

 

Locality: Cà D’Oro 

36020 - Asigliano Veneto (VICENZA) - ITALY 

TEL. +39 0444-772023 - FAX +39 0444-773129  

E-mail: [email protected] - Web: www.b-max.com 

Elmec Group S.r.l. Tax code and VAT no.: 03725780245 

 

B-MAX BOILERS 

3.0  INSTALLATION 

3.1  RESPONSIBILITY OF THE INSTALLER

 

 

 

The installer is responsible for : 

,checking the chimney flue, the air vents and all the  

necessary actions for installing the boiler. 

The installer is also responsible for: 

ensuring that all 

the safety regulations required by the specific legislation in force in the state, region, province 

and city of installation are respected.   
 
 

The use is subordinated to 

the instructions contained in the present manual  and all the 

safety regulations required by the specific legislation in force in the state, region, province, city 

where the boiler is installed must be complied to.  
 

The  UNI 10683 Directive defines the responsibilities of the installer: the installer must 

verify: 

 

 



The type of plant to be installed 



The compatibility of the installation area with the machinery itself in that the minimum 

distances required by the manufacturer must be respected 

 



The manufacturer’s requirements for the boiler regarding the smoke exhaust system 

 

 regulations 

(smoke 

channels and chimney flues)

 



The internal section of the chimney, the material in which it is constructed, the  

homogeneity of the section, the absence of obstructions 

 



The possibility of installing external air outlets and the sizes of existing ones 

 



The possibility of the co-existence of the boiler to be installed with pre-existing  

equipment  

 

 

If the checks are positive, the machine can then be installed, so long as the instructions  
supplied by the manufacturer and the regulations concerning safety and fire prevention are 
scrupulously observed.  
 
When the installation  is completed, there must be a test start-up of the plant, for a duration of not less than  
30 minutes, to check the general operational state of the equipment.   
 
When the installation is completed and after the first start-up of the plant, the installer 
must consign the following documentation to the client:

  



The machine use and maintenance manual (if not present inside the machinery) 

 



The necessary documentation in compliance with existing laws

 

 
 
 
 
 

TECHNICAL  

DESCRIPTION 

ENGLISH 

 

11 

Bmax Technology 

A Division of Elmec Group S.r.l. 

 

Locality: Cà D’Oro 

36020 - Asigliano Veneto (VICENZA) - ITALY 

TEL. +39 0444-772023 - FAX +39 0444-773129  

E-mail: [email protected] - Web: www.b-max.com 

Elmec Group S.r.l. Tax code and VAT no.: 03725780245 

 

B-MAX BOILERS 

3.2  SMOKE EXHAUST 

 

The smoke duct and connection to the chimney must be made in compliance with  

standards and laws in force.  The pipes used must be rigid, resistant to temperature and 

mechanical stress, and watertight

 

 

 

The chimney must guarantee the minimum depression indicated by current technical 

standards, considering a “Zero” pressure at the connection point with the smoke duct. 
Unsuitable or badly-sized chimneys or smoke ducts can increase combustion noise and 

negatively influence the generator combustion parameters. 
 
 
Non-insulated outlet ducts are a potential source of danger. 
 
 
The joints must be sealed using material that is resistant to a minimum temperature of 

350°C (e.g. fillers, rubber cement, silicon preparations). 

 

 

 

 

 

N.B.= Refer to the 

TECHNICAL DATA TABLE

 (paragraph 2.4) on page 9 for the size of the 

generator smoke duct

 .

 

 

 

3.3  POSITION

 

The POSITION in which the boiler is to be placed must be checked/established by the 

system installer or by a qualified technician, and account must be taken of technical  

requirements and laws in force. 

To position the boiler correctly, make sure that :

 



 it is 

placed it on a surface that has been levelled and is able to support the weight; 



 

the MINIMUM distances indicated in the 

figures below 

are respected to allow  

correct air flow and to allow normal CLEANING and MAINTENANCE operations to be 

carried out; 



ENGLISH 

TECHNICAL  

DESCRIPTION 

Содержание B-MAX 100

Страница 1: ... 773129 E mail info b max com Web www b max com Elmec Group S r l Tax Code and VAT no 03725780245 THE PRESENT MANUAL FORMS AN INTEGRAL PART OF THE BOILER AND MUST BE KEPT FOR FUTURE REFERENCE Pellet Boilers BEFORE USING THE BOILER IT IS OBLIGATORY TO READ AND UNDERSTAND THIS MANUAL IN ALL ITS PARTS Instructions for Use and Maintenance ...

Страница 2: ...Manufactured Products Directive 2006 42 CE Machinery Directive ANY MODIFICATION OF THE BOILER WITHOUT THE PRIOR CONSENT OF Elmec Group S r l WILL RENDER THIS DECLARATION NULL AND VOID SPACE FOR MACHINERY IDENTIFICATION PLATE Elmec Group S r l Location Cà D Oro 36020 Asigliano Veneto VICENZA ITALY Date 01 02 2014 Managing Director Rev 00 Date 28 05 2014 B MAX BOILERS NOTES ENGLISH Bmax Technology a...

Страница 3: ...S r l Tax code and VAT no 03725780245 B MAX BOILERS Dear Customer We thank you for choosing our product The B max Pellet Boilers can be connected to any type of heating system to Radiators Floor Skirting etc Our boilers have been exclusively studied to operate with wood pellets DIN quality 6 mm diameter Its structure is similar to a traditional wood boiler but it is far more economical It is extre...

Страница 4: ...quirements indicated in the present Manual and in particular must Never use the system for purposes other than those indicated in this manual Always carry out constant diligent Maintenance as indicated in the various chapters Follow the safety regulations currently in force in the state in which the boiler is installed Never tamper with the plant Only use genuine spare parts Ensure that the instal...

Страница 5: ...IT TO THE SMOKE EXHAUST ON THE BOILER Always use the safety devices and individual protection devices required in accordance with EEC Directive 89 391 Disconnect thepowersupplybeforecarryingoutanyoperations Always use suitable tools Before starting any work make sure that the combustion chamber is cold and that the ash is cold Also wait for the opening handles to cool down before touching them No ...

Страница 6: ...e following characteristics diam 6 mm max length 30 mm humidity 8 9 Do not use the Boiler as an incinerator Carry out all operations with the maximum concern for safety 17 Bmax Technology A Division of Elmec Group S r l Locality Cà D Oro 36020 Asigliano Veneto VICENZA ITALY TEL 39 0444 772023 FAX 39 0444 773129 E mail info b max com Web www b max com Elmec Group S r l Tax code and VAT no 037257802...

Страница 7: ...essary measures and to set up all the machinery and materials in such as a way as to ensure the correct and safe use of the equipment The present manual is in conformity with the latest regulations at the time of release onto the market It does not consider the machinery already on the market with its relative tecnical documentation deficient or inadeguate if eventual modifications or adjustments ...

Страница 8: ...no Veneto VICENZA ITALY TEL 39 0444 772023 FAX 39 0444 773129 E mail info b max com Web www b max com Elmec Group S r l Tax code and VAT no 03725780245 B MAX BOILERS 5 0 TRANSPORT and MAINTENANCE 5 1 TRANSPORT The Boiler is delivered on a pallet and protected with bubble wrap or in a wooden box for larger models Transport loading and unloading Transport loading and unloading must be carried out wi...

Страница 9: ...the safety devices or on parts of the Boiler or Burner 4 2 FIRST START UP AND SHUT DOWN When starting for the first time some of the oil and grease that coat the combustion chamber will tend to evaporate The room must be aired to allow these fumes to exit For the Start Up proceed as follows 1 Make sure that the Boiler is connected to the Hydraulic system 2 Connect the Burner to the mains 3 Ignite ...

Страница 10: ...r l Tax code and VAT no 03725780245 B MAX BOILERS 3 7 INSTALLING THE BURNER ON THE BOILER For questions of size distance and safety the Burner is supplied separately from the Boiler To install the Burner follow the instructions below 1 Insert the support collector 2 onto the 4 M8 pins 1 welded onto the Boiler door 2 Fix on the collector 2 using the M8 nuts 3 3 Completely insert the burner into the...

Страница 11: ...o the hydraulic system the heating plant and the boiler must be filled Before this operation it is necessary to check the hardness of the water and of water residue and if needed install for example if there is water with a fixed residue greater than 300 mg l at 180 C a water softener before the entry point of the water supply pipe This will ensure optimal conservation of the inside surfaces of th...

Страница 12: ...tart upoftheplant foradurationofnotlessthan 30minutes tocheckthegeneraloperationalstateoftheequipment When the installation is completed and after the first start up of the plant the installer must consign the following documentation to the client The machine use and maintenance manual if not present inside the machinery The necessary documentation in compliance with existing laws TECHNICAL DESCRI...

Отзывы: