Installation
15
[ I ]
4.
First insert the side of the device without the operating
element in the Preferred Room (e.g. sleeping room).
The side of the device with the operating element is
inserted in the
Outdoor Air Room
(e.g. corridor).
Note
The Outdoor Air Room is continuously supplied with
fresh air by a freeAir 100 ventilation unit.
5.
Mark 3 drillholes for an exact horizontal position.
Note
The both hooks for the front plate must face upwards.
6.
Set the drillholes precisely in both frames.
Содержание freeair plus
Страница 1: ...Operating Manual G General O Operation I Installation S Service ...
Страница 15: ...Installation 13 I Drawings ...
Страница 24: ...Service S 22 Control Error Analysis 1 A control error is indicated 2 Press and hold the button ...
Страница 27: ...Service S 25 Commissioning Date Serial number Company Name Signature ...