Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2019 Allendale LLC All Rights Reserved
350G XL
-
Lift Series
Quick Reference Sheet
-
Primary Guying Only
DEPLOYMENT
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
Repeat this process until you
reach the last center mast pole.
Lower the last center mast pole to
the ground and
lock the cam
lock.
Adjust the 4 primary guy ropes
and make sure the mast is straight
and perpendicular.
Lock the PRIMARY guy ropes by holding the rope in front of the handle
and sliding the handle towards the mast. Allow the rope to settle into the
cleat which will lock the rope into position.
73
72
74
75
72
76
Drive two stakes into the two
holes on the lift base plate and
make sure the cam lock is locked.
Check all cabling and guy wires to
make sure they are secure.
Deploy the surface wire grounding
kit at this time (if required)