902-290 6’ Sectional Slide

Install red plastic end caps on post bottoms. Install 10” square plywood 
squares in bottom of holes. Since your holes are 12” diameter and posts are 
centered in holes you have approx. 3.5” all around the post. Block the posts 
into center of holes when posts are on bubble.  Use scrap lumber and wedges 
to solidify the posts in their holes as you level the posts.  Re-blocking may 
be necessary at times in order to achieve level.  You may also have to widen 
your holes if they are not dug center. 
 
 

sides of your deck-top. 
When you go to install th

method is to make a table or stand to place your deck on at the required deck 
height.  The table will stabilize the deck so you can level it. Below is a 
typical table.  This one can be lowered or raised.  You can make a table fro
sawhorses.  

Remember, you must raise the deck to compensate for the resilient 

surfacing you will use

. With the deck resting on the table, you can spend 

Содержание 6' Sectional Slide 902-290

Страница 1: ...er all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy b...

Страница 2: ...ING LAYOUT see page 1 GENERAL ASSEMBLY INSTRUCTIONS Check all the parts and hardware with the packing list to be sure you have received everything needed to assemble this product CONTACT YOUR LOCAL DI...

Страница 3: ...t Screws Pour Concrete Dome top of cement for proper drainage Wait 48 hours before removing braces applying resilient surfacing and using equipment NOTE Attach warning label and Manufacturer s Identif...

Страница 4: ...when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additional information on deck clamp and deck installat...

Страница 5: ...Sectional Slide De Us a 4 level across marks to make sure the tops of the posts are equal to each other If line marks are on bubble then post tops should be on bubble to each other Mark 22 from bottom...

Страница 6: ...level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug center sides of your deck top When you go to install th method...

Страница 7: ...n the deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and...

Страница 8: ...your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts with a metal drill bit Install the roll pins so...

Страница 9: ...ted deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Avoid standing on decks until the addition of mor...

Страница 10: ...902 290 6 Sectional Slide Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before concrete is installed...

Страница 11: ...for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached with 4 clamps making sure you have evenly spaced the wall on both sides making sure there is less than 3 between the...

Страница 12: ...it over the 15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt was...

Отзывы: