background image

902-290 6’ Sectional Slide

 

902-323, 902-324, 902-325: 

 STEPLADDER 

 

Page 

12

 

Rev. 1/22/04

 

SportsPlay Equipment, Inc., 5642 Natural Bridge, St. Louis, MO 63120  (314) 389-4140 

www.sportsplayinc.com 

 
 
 
 
 
 
 
 
 
 

 

KKJJJ 

SPECIFICATIONS 

PARTS LIST 

Event:

 Connects to 3’, 4’, 5’ deck, 7 

¼” step and 8 ½” riser is #9 ga. 
expanded metals, top and bottom 
angle connection to deck and ground 
with ground legs.  Entire ladder is 
PVC coated after fabrication.  Arch 
entry wall is 1 3/8” O.D. steel with 
(4) clamps to connect. 
 

Paint:

  shall be electrostatically 

applied polyester dry powder coating
 

Hardware:

   shall be a combination 

of zinc-plated, stainless steel and 
aluminum. 

Ref Description QTY 

A  

Stepladder 

B Stepladder 

Bottom 

Leg 

C Stepladder 

Arch 

Entry 

D Pipe 

Clamps  4 

E Handrails  2 

 

 

 Hardware 

 

 

 

MAINTENANCE: 
 

• 

Touch up any marred paint 
surfaces. 

• 

Periodically check hardware for 
integrity and tightness. 

INSTRUCTIONS

:  

 

Temporarily lay the angle-lip of stepladder onto deck so that there is a 90-degree connection.  Center it 
over the 15” apart holes on top of deck. 

Mark on ground for the two bottom legs (20” apart).   

Remove ladder and dig two holes 12” wide and 24” deep. 

Connect the bottom leg with (2) 1 ¼” x 3/8” button head bolt, washer on top and lock nut on bottom. 

Install (2) re-bar in bottom leg pipes and install assembly into ground holes. 

Tip up to deck and connect to deck holes (on top of deck) with (2) 3/8” by 2” button head bolt, one 
washer on top and one on bottom, and lock nut. 

Connect the arch entry to the “outside” of the posts with (4) pipe clamps.  DO NOT tighten the clamp 
hardware yet. 

Connect the left and right handrails so that the top end (end with no holes) goes into the pipe sleeves on 
the arch entry. 

Line up the bottom of the handrail (2 per side) to the holes in the bottom side of stepladder. 

Connect these with (4) 3/8” by 2” button head bolts, no washer on the inside of the ladder, through 
ladder, then fasten with 3/8” lock nut. 

Tighten until lock nut is flush with thread end of bolt. 

Make sure arch entry clamps are level to each other and tighten. 

Fasten top portion of handrails with 3/8” by 3/8” setscrew. 

 

FOOTING DIAGRAM:

 

C

B

 

36”

10”

10”

               
3’steps 
*36” for 4’steps 
 48” for 5’ steps
 

Содержание 6' Sectional Slide 902-290

Страница 1: ...er all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy b...

Страница 2: ...ING LAYOUT see page 1 GENERAL ASSEMBLY INSTRUCTIONS Check all the parts and hardware with the packing list to be sure you have received everything needed to assemble this product CONTACT YOUR LOCAL DI...

Страница 3: ...t Screws Pour Concrete Dome top of cement for proper drainage Wait 48 hours before removing braces applying resilient surfacing and using equipment NOTE Attach warning label and Manufacturer s Identif...

Страница 4: ...when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additional information on deck clamp and deck installat...

Страница 5: ...Sectional Slide De Us a 4 level across marks to make sure the tops of the posts are equal to each other If line marks are on bubble then post tops should be on bubble to each other Mark 22 from bottom...

Страница 6: ...level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug center sides of your deck top When you go to install th method...

Страница 7: ...n the deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and...

Страница 8: ...your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts with a metal drill bit Install the roll pins so...

Страница 9: ...ted deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Avoid standing on decks until the addition of mor...

Страница 10: ...902 290 6 Sectional Slide Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before concrete is installed...

Страница 11: ...for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached with 4 clamps making sure you have evenly spaced the wall on both sides making sure there is less than 3 between the...

Страница 12: ...it over the 15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt was...

Отзывы: