7.0
Component Identification and Typical Operation - Single Pump Skid
* PRV = Pressure Relief Valve preset at 50psi
Chemical
Output
Pressure Gauge
Chemical Feed
Flowmeter
One way
Check Valve
(with union)
Calibration
Cylinder
Pulse
Dampener
(optional)
V2
Chemical
Input #2
Chemical
Input #1
V1
V10
V7
V8
V6
Y Strainer
PRV*
V3
V4
V5
V9
Gauge
Guard
Connections:
Connect chemical solution into either Inlet 1 or inlet 2. (V-1 or V-2)
Connect chemical treated system to outlet. (V-10)
To Pump chemical solution into system.
Open ball valve V-1 or V-2, depending on your inlet side.
Open ball valve V-3 and V-4.
Close ball valve V-5, V-6, and V-9.
Open ball valve V-10 to inject chemical solution into your system.
Start pump.
To calibrate pump / system.
Open ball valve V-1 or V-2, depending on your inlet side.
Open ball valve V-3, V-4 , and V-6.
Close ball valve V-5, V-9, and V-10.
Start pump and run until calibration cylinder is filled to top calibration line. Do not leave pump unattended during
this operation.
Stop pump once calibration cylinder is filled.
Close ball valves V-1, V-2, and V-6.
Open ball valve V-5 and V-10 to inject chemical solution into your system.
Note the chemical solution level in the calibration cylinder.
To calibrate pump at maximum speed into your system, Press the prime button on pump. The prime mode runs the
pump at maximum speed for 60 seconds (1 minute) on all Blue-White® ProSeries-M pumps.
To calibrate pump at your desired feed rate, you must pre-program your pump speed before running this routine.
Please refer to the instruction manual for your pump to adjust feed rate and additional calibration instructions.
U-2
P
PRV-1
CV-1
U-4
U-5
V-1
V-2
V-5
V-4
V-6
V-7
PD-1
G-1
MS-6
V-9
T-1
T-2
Chemical
Inlet 2
Chemical
Inlet 1
Chemical
Outlet
Safety vent
to tank
S-1
CC-1
U-1
V-3
V-8
V-10
U-3
F-1
S-2
7.1
How To Operate the Chem-Feed® Skid System - Single Pump Skid
Page 10
Page 11
®
CHEM-FEED CFPS
®
CHEM-FEED CFPS