BLUE SKY SOLAR BOOST 2000E Скачать руководство пользователя страница 1

 

 

 

 

SOLAR BOOST™ 2000E 

 

 

25AMP 12VDC MAXIMUM POWER POINT TRACKING 

PHOTOVOLTAIC CHARGE CONTROLLER 

 

INSTALLATION AND OPERATION 

MANUAL 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

THIS MANUAL INCLUDES IMPORTANT SAFETY INSTRUCTIONS FOR MODEL SB2000E 

SAVE THESE INSTRUCTIONS. 

 
 
 
 
 
 

 

COVERED UNDER ONE OR MORE OF THE FOLLOWING US PATENTS 

6,111,391 

 

© Blue Sky Energy, Inc. 2011                                                                                                                                                                                                            430-0012 H 

Содержание SOLAR BOOST 2000E

Страница 1: ...G PHOTOVOLTAIC CHARGE CONTROLLER INSTALLATION AND OPERATION MANUAL THIS MANUAL INCLUDES IMPORTANT SAFETY INSTRUCTIONS FOR MODEL SB2000E SAVE THESE INSTRUCTIONS COVERED UNDER ONE OR MORE OF THE FOLLOWING US PATENTS 6 111 391 Blue Sky Energy Inc 2011 430 0012 H ...

Страница 2: ...lectrostatic Handling Precautions 5 Selecting PV Modules 6 Temperature Compensation 6 Battery and PV Wiring 6 Setting Charge Voltage 7 Maximum Power Voltage 7 Optimizing MPPT 7 TROUBLESHOOTING GUIDE 8 SPECIFICATIONS 9 FIVE YEAR LIMITED WARRANTY 9 TABLES AND FIGURES Table 1 Charge Status Indicator 3 Table 2 Maximum Conductor Length 3 Voltage Drop 7 Figure 1 Front Panel and Remote Display Indicators...

Страница 3: ...ry or other electrical part that may cause explosion i Remove personal metal items such as rings bracelets and watches when working with a lead acid battery A lead acid battery can produce a short circuit current high enough to weld a ring or the like to metal causing a severe burn j Remove all sources of power photovoltaic and battery before servicing or installing 4 CHARGER LOCATION INSTALLATION...

Страница 4: ...ghly accurate displayed voltage may be somewhat higher than actual battery terminal voltage when high charge current is being delivered to the battery This is due to voltage drop in the wires between the 2000E and battery Error during charge can be minimized by using large low resistance wiring The 2000E operates on battery power not PV power A battery must be connected with a minimum voltage of 9...

Страница 5: ... should always plan and monitor the process Equalization is essentially a controlled over charge and should only be performed on vented liquid electrolyte lead acid batteries Repeated charge discharge cycles can lead to an imbalance in the specific gravity and state of charge of individual battery cells Equalization brings all battery cells up to the same specific gravity and eliminates electrolyt...

Страница 6: ...0 with a discharged battery in near freezing temperatures For a more complete MPPT description see www blueskyenergyinc com INSTALLATION WARNING Read understand and follow the Important Safety Instructions in the beginning of this manual before proceeding This unit must be installed and wired in accordance with National Electrical Code ANSI NFPA 70 Over current protection must be provided external...

Страница 7: ...s recommendation Most 12 volt flooded or GEL lead acid chemistry batteries require the 30 0 millivolts C 5 00mV C cell setting NiCd and many lead acid chemistry AGM type batteries require the 20 0 millivolts C 3 33mV C cell setting WARNING Do not attach a sensor or any connections other than Blue Sky Energy battery temperature sensor p n 930 0022 20 to the temperature sensor terminals Be certain t...

Страница 8: ... be eliminating the need to have the battery be highly charged To access this and other technical bulletins see www blueskyenergyinc com MAXIMUM POWER VOLTAGE The nominal setting for this adjustment is the difference between the PV panel s open circuit voltage VOC and maximum power voltage VMP These voltage values are typically listed on both the PV panel datasheet and on the rating label affixed ...

Страница 9: ...cause battery voltage is at setpoint relays may switch on off This normal and will cause no harm The on off symptom will go away with a slight increase or decrease in battery voltage or load current PV BAT must not connect together external to controller for proper operation Relays click on off rapidly Dip switch 2 off Double check dip switch 2 must always be on Used for factory test only Charge s...

Страница 10: ...ct of God f operation or installation contrary to instructions pertaining to the product or g cosmetic aging 4 If BSE s examination of the product determines that the product is not defective the consumer shall be charged a test and evaluation fee of 20 and be responsible for all transportation costs and insurance related to returning the product to the consumer The consumer is ultimately responsi...

Страница 11: ...Blue Sky Energy Solar Boost 2000E MOUNTING TEMPLATE Figure 4 ...

Отзывы: