Blue Giant BG E-Step Скачать руководство пользователя страница 9

SECTION 2

PLANNED MAINTENANCE

2-1.

 

GENERAL.

Planned maintenance consists of periodic visual and 
operational checks, inspection, lubrication, and 
scheduled maintenance designed to catch an issue in 
the early hours or discover malfunctions and defective 
parts. The operator performs the checks in the 
Operator’s Manual, and refers any required servicing 
to a qualified maintenance technician who performs 
the planned maintenance and any required servicing.

2-2.

 

MONTHLY AND QUARTERLY CHECKS.

Table 2-1

 is a monthly and quarterly inspection and 

service chart based on normal usage of equipment 
eight hours per day, five days per week. If the vehicle 
is used in excess of forty hours per week, the 
frequency of inspection and service should be 
increased accordingly. These procedures must be 
performed by a qualified service technician or your 

Blue Giant

 Service Representative.

2-3.

 

FREQUENT INSPECTIONS.

 The owner and user are required by ANSI A92.6 to 
ensure frequent inspections of the 

BG E-Step

 Semi-

Electric Access Vehicle occur and are performed in 
accor-dance with the following points: 1. If purchased 
used unless it's determined that the frequent and 
annual inspections are current. 2. The 

BG E-Step

 

Semi-Electric Access Vehicle has been in service for 
three (3 months or 150 hours, whichever comes first. 
3.

 

The 

BG E-Step

 Semi-Electric Access Vehicle has

 

been out of service for a period longer than three (3

 

months. inspection is to be performed by a mechanic

 

that is qualified and authorized to perform service on

 

the 

BG E-Step

 Semi-Electric Access Vehicle. All

 

service records must be maintained.

2-4.

 

ANNUAL INSPECTIONS.

 The owner and user are required by ANSI A92.6 to 
ensure annual inspections of the 

BG E-Step

 Semi-

Electric Access Vehicle occur and are performed no 
later than 13 months from the date of prior annual 
inspection or every 700 hundred hours of use, 
whichever occurs first. This annual inspection is to be 
performed by a mechanic that is qualified and 
authorized to perform 

service on the 

BG E-Step

 Semi-Electric Access 

Vehicle. All service records must be maintained..

2-5.  BATTERY CARE.

2-5.1.

 

General

The vehicle may be equipped with maintenance free 

Lithium ion 

battery.

The care and maintenance of the battery is very 
important to obtain efficient vehicle operation and 
maximum battery life.

CAUTION:

Gases produced by a battery can be 
explosive. Do not smoke, use an open 
flame, create an arc or sparks in the 
vicinity of the battery. Ventilate an 
enclosed area well when charging.

CAUTION:

Batteries contain sulfuric acid which may 
cause severe burns. Avoid contact with 
eyes, skin or clothing. In case of contact, 
flush immediately and thoroughly with 
clean water. Obtain medical attention 
when eyes are affected. A baking soda 
solution (one pound to one gallon of 
water) applied to spilled acid until 
bubbling stops, neutralizes the acid for 
safe handing and disposal.

Table 2-1 Monthly and Quarterly Inspection and Service Chart

VISUAL CHECKS

INTERVAL

INSPECTION OR SERVICE

Monthly

Check brake for proper operation.

Monthly

Inspect wiring for loose connections and damaged insulation.

Monthly

Check wheels for wear and damage.

Quarterly

Check lift cylinder for leakage.

9

Содержание BG E-Step

Страница 1: ...rate or service this product unless you have read and fully understand the entire contents of this manual Failure to do so may result in property damage bodily injury or death ISSUE DATE DECEMBER 7 20...

Страница 2: ...mps and obstructions Before and during all vehicle operations ensure that adequate clearance is maintained from overhead obstructions and energized electrical conductors and parts Before elevating pla...

Страница 3: ...NOTES 3...

Страница 4: ...RTMENT COVER REMOVAL 4 1 4 1 FRONT COMPARTMENT COVER 4 1 4 1 1 Cover Removal 4 1 4 1 2 Cover Installation 4 1 5 FLOOR LOCK SYSTEM 5 1 5 1 FLOOR LOCK 5 1 5 1 1 Floor Lock Motor Replacement 5 1 6 LOAD W...

Страница 5: ...Vehicle lifts and transports up to 750 pounds capacity including load and operator The vehicle enables general maintenance work and effi cient selection and moving of materials in any area or at any l...

Страница 6: ...ering Button Lower the operator platform 6 Key switch Switches control current on and off Removing the key prevents the access vehicle from being switched on by unauthorized personnel 7 Emergency stop...

Страница 7: ...ized Dealer for replacement 1 4 INSTALLATION WARRANTY CHECK LIST Blue Giant initiate t t t all e a a e en Blue Giant at Figure 1 3 Data Plate R8553 7 BLUE GIANT EQUIPMENT CORPORATION www BlueGiant com...

Страница 8: ...ption of Fault Nature of Fault Corrective Procedure Full Details Required Incomplete Information will Delay Process Blue Giant Part Part Description QTY Blue Giant Replacement Part s Invoice Number s...

Страница 9: ...to perform service on the BG E Step Semi Electric Access Vehicle All service records must be maintained 2 4 ANNUAL INSPECTIONS The owner and user are required by ANSI A92 6 to ensure annual inspectio...

Страница 10: ...onnel This manual and the manufacturer s instructions concerning batteries and charging stations must be observed when carrying out the work 2 5 6 Battery Care and Charging CAUTION Never smoke or brin...

Страница 11: ...on please reverse step 1 5 Replace only with original OEM batteries or batteries approved by an authorized Blue Giant dealer Contact your authorized Blue Giant dealer for information on optional batte...

Страница 12: ...Table 2 2 for the recommended types of grease and oil in conjunction with Figure 2 2 identifies the items requiring lubrication Table 2 2 Recommended Lubricants R8556 Code Description Used for A L HM4...

Страница 13: ...atefor capacity d Defective lift motor relay Replace relay on pump motor e Battery charge low Charge battery Platform does not lift pump motor does not run Check and recharge if required Check and rep...

Страница 14: ...NOTES 14...

Страница 15: ...tch and turn off key switch 2 Remove four screws that holds the cover down 3 Carefully lift cover up and off the vehicle 4 1 2 Cover Installation 1 Carefully position cover on the vehicle 2 Install fo...

Страница 16: ...NOTES 16...

Страница 17: ...t switch and turn off key switch 2 Block load wheels 3 Remove the compartment cover as described in paragraph 4 1 1 4 Disconnect electric motor from harness 5 Remove the mounting screws and motor asse...

Страница 18: ...NOTES 18...

Страница 19: ...eel 9 Inspect bearings and replace if necessary 6 1 2 Installation 1 Pack bearings with grease 1 Reassemble bearings in load wheel 2 Position load wheel on the axle and install two bolts two lock wash...

Страница 20: ...Figure 6 1 Frame ED_0001 20...

Страница 21: ...buttons to refill the cylinder and lines with hydraulic oil 8 Check level of hydraulic oil If required add hydraulic oil to bring to proper level Use hydraulic oil listed in Table 2 2 9 Install the c...

Страница 22: ...Figure 7 1 Hydraulic System ED_0004 22...

Страница 23: ...k the platform to get access to the hydraulic fitting at the base of the cylinder Make sure to securely block the vehicle or use strong supports so that the vehicle won t lower down 3 Remove five scre...

Страница 24: ...NOTES 24...

Страница 25: ...witch 2 Remove the compartment cover as described in paragraph 4 1 1 3 3 Remove any dirt or corrosion from the bus bar area The controller should be wiped clean with a moist rag Allow it to dry before...

Страница 26: ...s and harness from control panel 4 Remove four screws four lock washers four flat washers and panel 5 Remove the Control Panel Assembly out of the way 6 Disconnect cables and harnesses from charger 7...

Страница 27: ...arrangement is secure before proceeding 3 Engage the emergency power disconnect switch and turn off key switch 4 Disconnect the electrical connectors at each end of the mast cable 5 Disconnect the mo...

Страница 28: ...NOTES 28...

Страница 29: ...SECTION 9 OPTIONAL EQUIPMENT 9 1 N A 29...

Страница 30: ...NOTES 30...

Страница 31: ...SECTION 10 ILLUSTRATED PARTS BREAKDOWN Following is an illustrated parts breakdown of assemblies and parts associated with the BG E Step Semi Electric Access Vehicle 31...

Страница 32: ...Figure 10 1 Frame ED_0001 32...

Страница 33: ...EEP GROOVE BALL BEARING 6204 4 14 1650 100007 00 WHEEL SHAFT 2 15 0000 001623 00 KEY 8 40 2 16 1650 100006 00 BEARING RETAINER 2 17 0000 000479 00 SCREW M5 16 8 18 1113 210100 0A LOADING WHEEL 2 19 20...

Страница 34: ...Figure 10 2 Operator Platform ED_0002 34...

Страница 35: ...XIS 2 15 1600 700005 00 BUSHING 2 16 0000 001521 00 SCREW M5 10 4 17 1600 700012 00 BUMPER 2 18 1600 702000 0B RIGHT DOOR 1 19 3020 060000 07 SCREW M8 20 2 20 1650 700001 00 01 RIGHT COVER 1 Red 20 16...

Страница 36: ...Figure 10 3 Operating Control Assembly ED_0003 36...

Страница 37: ...VER 1 6 1650 700003 00 LEFT BOTTOM COVER 1 7 1600 300004 00 RUBBER 2 8 1650 520007 10 WIRE HARNESS 1 9 CK11 520012 00 BUTTON SWITCH 3 10 1115 510006 60 METER 1 11 1115 520003 0A KEY SWITCH 1 12 3218 6...

Страница 38: ...Figure 10 4 Decals 38 EC_0009...

Страница 39: ...VEL SURFACE ONLY LABEL DECAL 1 4 5080 000016 79 PINCH POINT WARNING LABEL 2 5 5080 000016 15 Blue Giant DECAL 1 6 2069 000000 22 KEY SWITCH DECAL LABEL 1 7 2069 013000 06 POWER SHUT OFF LABEL 1 8 2069...

Страница 40: ...Figure 10 5 Hydraulic System ED_0004 40...

Страница 41: ...2707 141400 30 ARTICULATED JOINT 2 7 0000 000044 00 SEALING GASKET 14 4 8 0000 001674 00 SEALING GASKET 12 2 9 1650 100400 00 LINEAR ACTUATOR 1 10 3070 000000 16 SHAFT 10 65 1 11 0000 000376 00 COTTE...

Страница 42: ...Figure 10 6 Hydraulic Pump Assembly ED_0005 42...

Страница 43: ...60005 00 THROTTLE 1 12 1650 42012X 00 FLOW DIVIDER COMBINER VALVE 1 13 1115 560010 00 CONNECTING SHAFT 1 14 1115 560011 00 GEAR PUMPS 0 75CC R 1 15 1115 560012 00 FLAT PAD 5 2 16 1115 560013 00 SCREW...

Страница 44: ...Figure 10 7 Lift Cylinder ED_0006 44...

Страница 45: ...50 411000 00 LIFT CYLINDER ASSEMBLY 2 KIT 1650 QJYG 0A SEAL KIT 1 Includes pos 1 5 1 1650 41001X 00 DUST SEAL 1 2 1650 41002X 00 SEALING RING 20 28 5 1 3 1650 41003X 00 O RINGS 32 2 4 1 4 2130 414000...

Страница 46: ...Figure 10 8 Electrical System ED_0007 46...

Страница 47: ...723 00 SCREW M3 10 2 5 1115 500006 00 CHARGER CABLE USA 1 6 1120 540001 00 STAND 1 7 0000 000126 00 SCREW M6 16 2 8 0000 000550 00 NUT M8 2 9 0000 000210 00 FLAT PAD 8 4 10 1115 510003 00 FUSE 100A 1...

Страница 48: ...Figure 10 9 Wiring Harness ED_0008 48...

Страница 49: ...PART NUMBER DESCRIPTION QTY REQD NOTES 1 1650 520001 10 MAIN WIRING HARNESS 1 2 1650 520009 10 WIRE HARNESS 1 3 1650 520002 10 WIRE HARNESS 1 4 1650 520003 10 WIRE HARNESS 1 5 1650 520004 10 RELAY WIR...

Страница 50: ...ica t 1 800 872 2583 f 1 888 378 5781 Copyright Blue Giant Equipment Corporation 2020 Corporate 410 Admiral Blvd Mississauga ON L5T 2N6 t 905 457 3900 f 905 457 2313 USA 6350 Burnt Poplar Rd Greensbor...

Отзывы: