background image

 5

1 866 907 0122     blubathworks.com

2018-01

®

3

4

4

A

4

B

Содержание blu-stone BT0102

Страница 1: ...estanding bathtub Installation Guide BT0102 BT0104 BT0105 1 866 907 0122 blubathworks com 2017 06 BT0305 BT0110L BT0110R BT0203 BT0207 BT0402N16 BT0305N15 BT0305N17 BT0402 BT0304N17 BT0402N17 BT0304 B...

Страница 2: ...y of the product in good order to the carrier All complaints regarding damage due to transport must be made directly to the carrier 5 Place the unit in the bathroom before you start working Conserve a...

Страница 3: ...e Use 1 FIP adaptor Install the basic plumbing components water inlet and waste These tub models require a vertical plumbing connection from the floor Shims may be required to level the tub depending...

Страница 4: ...ary by model Using a blanket cardboard or other clean protective surface turn the unit on its side so that the unit is properly supported during drain installation Clean the drain hole area in prepara...

Страница 5: ...the waste drain Install 1 rubber slip gasket over the waste drain Alternatively Blu Bathworks recommends BTWaste RN Island Tub Drain for easy installation of freestanding bathtubs Provided by customer...

Страница 6: ...professionals only and according to our install recommendations as well as federal provincial state and local building codes and regulations 8 9 ALCOVE INSTALLATION USING TILE FLANGE BT0102 BT0104 BT...

Страница 7: ...6 1 866 907 0122 blubathworks com 2017 06 ALCOVE INSTALLATION EXAMPLES BT0102 BT0104 BT0105 only BT0110L R...

Страница 8: ...block provided in a gentle circular motion Higher grit sandpaper may be required to blend the repaired area to match the existing product finish blu stone gloss finish Ensure there is no surface dirt...

Страница 9: ...Acrylic Freestanding Bathtub Installation Guide 1 866 907 0122 blubathworks com 2017 03 BT8002B16 BT8002B18 BT8004B16 BT8004B18 BT8006B15 BT8006B17 BT8001 BT8005 BT8007...

Страница 10: ...der to the carrier All complaints regarding damage due to transport must be made directly to the carrier 5 Place the unit in the bathroom before you start working Conserve all nuts and bolts 6 To prot...

Страница 11: ...n padded material to ensure that the bathtub is not scratched or damaged through contact with the floor 3 Measure the location of the feet and transfer measurement to the floor 4 The floor finish will...

Страница 12: ...e bathtub by the panels Raise the bathtub up to 3 with 4x4 pieces of lumber so you can have access from the bottom of the bathtub The basic installation of plumbing pipes drain water supply must be pe...

Страница 13: ...bathtub legs into position by tightening the adjoining nut once an accurate level is confirmed 5 4 The water outlet pipe should be connected Connect integrated overflow tube to outlet drain 6 Apply si...

Страница 14: ...at least 24 hours before use Finished floor level 2 Finished floor level 1 Prepare the Tail Piece All parts involved in tail piece installation are provided by the installer Fig A Waste drain must al...

Страница 15: ...w 1 Determine wall finish material and its thickness 2 Install tile flange on corner edge of bathtub using high density silicone above and below lip of TF BTSB tile flange as shown in Detail I explode...

Страница 16: ...7 1 866 907 0122 blubathworks com 2017 03 Alcove Installation Examples BT8001 60 1524 60 1524 32 813 32 813 60 1524 32 813 60 1524 32 813...

Страница 17: ...8 1 866 907 0122 blubathworks com 2017 03 Waste Drain provided 1 Female Adapter 1 ABS Pipe cut to length 1 ABS Trap Provided by plumber...

Страница 18: ...ff with warm water Be sure to use soft sponges You want to avoid abrasive cleaning pads or other products with fine grit Use soft cleaners are the key here since acrylic is easily scratched Try bathro...

Страница 19: ...1 866 907 0122 blubathworks com 2018 01 blu stone shower bases Installation Guide SB8080 SB8120 SB8150 SB8250 SB9090 SB9120 SB9150 SB9250...

Страница 20: ...c and building regulations 2 The following instructions are to be followed by qualified personnel with the technical background and experience needed to manage the product safely 3 This shower base sh...

Страница 21: ...mi recessed leave inch of space around the entire perimeter which must be sealed with acetic silicone as to make room for the thermal expansion of the material Let the silicone dry for at least 24 hou...

Страница 22: ...x 31 or 35 x 35 800 x 800 or 900 x900 31 35 800 900 Optional customizable length Surface mount version Optional customizable length Level Mortar Plaster or Mastic for floor leveling Silicon Handsaw T...

Страница 23: ...907 0122 blubathworks com 2018 01 Surface mount Assembly R L 1 According to the drain installation manual by the drain manufacturer 2 Drain not included 2 2A Silicon 31 35 800 900 Refer to detail 1 on...

Страница 24: ...5 1 866 907 0122 blubathworks com 2018 01 3 4 4A 4B...

Страница 25: ...6 907 0122 blubathworks com 2018 01 Recessed Assembly R L 1 According to the drain installation manual by the drain manufacturer 2 Drain not included Silicon 2 2A H 31 35 800 900 Refer to detail 1 on...

Страница 26: ...7 1 866 907 0122 blubathworks com 2018 01 4 4A 4B...

Страница 27: ...lectrical appliances radios hair dryers etc 5 Pay special attention when using the shower alone standing under running hot water for a long time could cause nausea dizziness and lack of consciousness...

Страница 28: ...block provided in a gentle circular motion Higher grit sandpaper may be required to blend the repaired area to match the existing product finish blu stone gloss finish Ensure there is no surface dirt...

Отзывы: