4.2 Power on
4.2.1 Normal Power On
The normal way of power on is press the power on key, then the PWRKEY is pulled down
and the system is powered on. At this time, all of the LDOs integrated in the PMU are
started except the VSIM and the VCORE starts the reset timer. After the time out, the reset
signal will be sent out(H), then the digital baseband will be also started. That means the
MT6592 go to the working states. It will begin polling and detecting the state of the
PWRKEY. In case of the pulling up of the PWRKEY, the power on key can be released.
This is the first process of the power on.
Power on process as follow:
4.2.2 Schedule Power On/OFF
The RTC module can also realize the power on because it can pull up the PWRKEY and
start all the LDOs. This way can be used as Schedule Power On/OFF.
Содержание LIFE 8
Страница 1: ...BLU LIFE 8 SERVICE MANUAL...
Страница 3: ...5 10 Charge function 27 6 DEFECT DESCRIPTION ABBREVIATION 28 7 THE TAG 29...
Страница 7: ...2 1 LIFE 8 product description Product review...
Страница 8: ...2 2 Assembly components on TOP layer as follow...
Страница 9: ...2 3 Assembly components on Bottom layer as follow...
Страница 10: ...2 4 LIFE 8 Hardware Diagram The HW Diagram as follow...
Страница 15: ...3 2 3 TX circuit examine and repair flow chart...
Страница 19: ...3 3 3 RX examine and repair flow chart...