background image

13

Continue draining water for about fifteen (15) seconds, from control until water is clean.
Manually close valve.  Recheck gauge glass.  If water level has dropped significantly,
wait for the boiler to restore water level and pressure and repeat if necessary.

1. 

Water level control should be opened daily to blowdown sediment and scalant.

2.  Observe that the water in gauge glass is clean and clear.  Extreme murkiness in

water indicates inadequate water quality.

3.  Safety valve should be tripped during operation once a week to assure that it

functions properly.

4.  Keep all exposed cleanable areas of unit clean at all times.

CAUTION:  Disconnect the power supply during cleaning or
servicing.

Содержание SB-10SC

Страница 1: ...CTION STEAMER ON A STEAM COIL BOILER BASE INSTALLATION OPERATION MAINTENANCE BLODGETT OVEN COMPANY www blodgett com 44 Lakeside Avenue Burlington Vermont 05401 USA Telephone 800 331 5842 802 860 3700 Fax 802 864 0183 S00060 Rev B 12 04 ...

Страница 2: ...installation operation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing operating or servicing this equipment CAUTION Operating testing and servicing should only be performed by qualified personnel NOTICE Contact the factory the factory representative or local service com...

Страница 3: ...AGE Important Notes 2 Service Connections 4 Introduction 5 1 0 Installation Instructions 6 2 0 Information to Steam Fitter 8 3 0 Operating Instructions 10 4 0 Periodic Maintenance 12 5 0 Cleaning Instructions 14 6 0 Troubleshooting 16 ...

Страница 4: ...e of water quality consult a FAILURE OR MALFUNCTION OF THIS APPLIANCE DUE TO POOR WATER QUALITY IS NOT COVERED UNDER WARRANTY Water which fails to meet these standards should be treated by installation of water conditioner 7 0 8 5 Less than 1 5 PPM Less than 13 PPM WATER QUALITY STATEMENT Less than 20 PPM Less than 60 PPM Pressure reducing valve is required if incoming pressure exceeds 50 PSI 345 ...

Страница 5: ...ave been generated in the heat exchanger and ready pilot light will come on OFF shuts off the steam supply to the boiler and opens the automatic blowdown valve if so equipped emptying the boiler and releasing water and steam to the drain The manual blowdown valve will have to be opened to drain if not equipped with automatic blowdown valve 2 Boiler pressure gauge should read 9 11 psi during operat...

Страница 6: ... connections Allow enough space between any other piece of equipment or wall for service access Service to the controls may be required on the left and or right side panels of the cabinet INSTALLATION CODES AND STANDARDS The appliance must be installed in accordance with In Canada Provincial and local codes or in the absence of local codes with the Canadian Electric Code CSA C22 1 latest edition C...

Страница 7: ...unit back in position and re level left to right and front to back 6 Bolt and anchor appliance securely to the floor 7 Seal bolts and flanged feet with Silastic or equivalent compound 8 Make service connections as indicated WARNING Electrical and grounding connections must comply with applicable portions of the National Electrical Code and or other local electrical codes WARNING Disconnect electri...

Страница 8: ...rs of that pipe Thus a 1 pipe having a straight length of 120 10 feet is equivalent to 120 diameters of that pipe and will have a pressure loss of 1 psi through that pipe Example 1 Note in 3 4 pipe size that a Standard 90º Elbow and Angle Valve and a Globe Valve are equivalent to 1 8 feet 10 feet and 18 feet respectively of straight pipe Similarly in a 1 pipe size a standard 90º Elbow and Angle Va...

Страница 9: ...iance to drain out water condensed steam from the line to assure clean dry steam to the appliance EXHAUST HOOD An exhaust system should be located directly above the boiler to exhaust steam and heat generated by the boiler PLUMBING CONNECTIONS WARNING Plumbing connections must comply with applicable sanitary safety and plumbing codes Water Supply Connection The incoming cold water supply connectio...

Страница 10: ...er must be completed once daily prior to operation see instruction plate or above for boiler start up procedures With ready pilot light on preheat steamer compartment for one minute when the steamer is to be first used for the day or whenever the compartment is cold 1 Close compartment doors and set timer to 1 minute 2 When buzzer sounds set timer to the OFF position 3 Steamer is now ready for coo...

Страница 11: ...oors slightly open 2 At the end of the day the steam supply must be shut off Open the door of cabinet base and turn off power switch Open manual drain valve If unit is equipped with automatic blowdown valve it will open and drain the boiler CAUTION If steam supply does not shut off during blowdown immediately discontinue use of appliance and call for service Each compartment is equipped with a rem...

Страница 12: ... that the accumulation of sediment does not interfere with the movement of the float in the control Control must be flushed at least once a day When flushing control note water level in gauge glass allow the boiler to fill if necessary and also to come up to temperature Before flushing control note that water level in gauge glass is within operating range and the boiler pressure is at least 6 psi ...

Страница 13: ...t if necessary 1 Water level control should be opened daily to blowdown sediment and scalant 2 Observe that the water in gauge glass is clean and clear Extreme murkiness in water indicates inadequate water quality 3 Safety valve should be tripped during operation once a week to assure that it functions properly 4 Keep all exposed cleanable areas of unit clean at all times CAUTION Disconnect the po...

Страница 14: ...ush and mild detergent clean inside the drain opening ensuring there is no food residue or blockage Clean the drain screen and replace in its original position 4 Wash gasket sealing surface with mild detergent to remove harmful food acids and rinse 5 Water level control should be opened daily to blow down sediment and scalant 6 Observe that the water in gauge glass is clean and clear Extreme murki...

Страница 15: ...ce 3 4 pipe cap OR union fitting 5 Open water supply to appliance allowing water to fill Generator tank to required level On appliances with Manual Blowdown turn ON power switch Boiler will fill to the required level 6 Let appliance cycle allow two hours for descaling and cleaning DO NOT TURN STEAM ON 7 Open both the blowdown and water level control valves for complete drainage and then close both...

Страница 16: ... water level control valve is closed 5 Supply water pressure too low AUTOMATIC BLOWDOWN VALVE DOES NOT DRAIN 1 Defective Blowdown valve 2 Heat exchanger build up of scalant clogging drain lines and valve HEAT EXCHANGER ACHIEVES PRESSURE SLOWER THAN NORMAL 1 Heavy build up of lime on heat exchanger tubes 2 Steam supply pressure too low SAFETY VALVE BLOWS 1 Defective safety valve 2 Pressure too high...

Страница 17: ...e low signal to 13 0 psi 2 OVERRIDE PRESSURE SWITCHES Allow pressure to increase to 13 psi Set the high signal to switch at 13 psi on the gauge and the low signal to 11 psi 3 OPERATING PRESSURE SWITCHES Set the high signal to switch at 11 psi on the gauge and the low signal to 9 psi Release pressure in boiler to below 9 psi Elements will come on Once pressure has reached 11 psi elements will shut ...

Отзывы: