BLiNQ Networks Inc.
X-1200 System Installation Guide
Release 1.0
Confidential - Restricted Use and Duplication
Page
42
Issue 01 D1
Table 14 Recommended Torque Values for Antenna Bracket Nuts
Item
Description
Torque
Note
1
Antenna bracket nuts (x4)
10.8Nm or 8lbf-ft
Mount the antenna bracket on the antenna
To attach the Beam Steering Antenna to the Beam Steering Antenna mounting bracket:
1.
Position the antenna bracket on top of the four (4) raised, threaded studs on the back of the Beam
Steering Antenna. Position the antenna bracket so that the adjustable holes (down-tilt) are at the
top and the single mounting holes are at the bottom of the antenna.
2.
Place a lock nut on each of the antenna studs and tighten the nuts to the specified torque. Follow
the Torque setting from Table 14, “Recommended Torque Values for Antenna Bracket Nuts”.
7.2.2
Mounting the Antenna Assembly on to HM
The Beam Steering Antenna mounts onto the outside casing of the Hub Module (HM). There are four (4)
dedicated mounting holes, two (2) on each side, of the HM.
Required parts and tools:
Beam Steering Antenna with mounted Beam Steering Antenna bracket, see Section 7.2.1,
“
Installing the Bracket on to the
Socket wrench with ¼ in. driver head, with long M4 and M5 sockets
Torque wrench, ¼ in. head with range for 4-60Nm or 3-45lbf-ft
Four (4) antenna bracket bolts
Table 15 Recommended Torque Values for Antenna Bracket Bolts
Item
Description
Torque
Note
1
Antenna bracket bolts (x4)
10.8Nm or 8lbf-ft
Mount the antenna bracket on the HM
Adjustable Down-tilt
Mounting Holes
Mounting Studs
(x4)
Beam Steering
Antenna
RF Cable Connectors
(N-Type) x2
Control Interface
Connector
RF Cable
Connectors
(N-Type) x2