Copyright ©2022 SemaConnect, LLC. All rights reserved.
dwfwdfwfwfwfwffffgd
www.SemaConnect.com
Electrical Requirements
Each SemaConnect EV charging station is listed and labeled through Nationally Recognized Testing Laboratory compliance
testing at the maximum or ‘full rated’ output. Each station is capable of continuous full rated output
up to its labeled rating or
modified default output configurations in accordance with the following tables: