background image

 

 

 

 

Copyright ©2022 SemaConnect, LLC. All rights reserved.   

dwfwdfwfwfwfwffffgd                 

www.SemaConnect.com 

 
 

 

Electrical Requirements 

 

Each SemaConnect EV charging station is listed and labeled through Nationally Recognized Testing Laboratory compliance 

testing at the maximum or ‘full rated’ output. Each station is capable of continuous full rated output 

up to its labeled rating or 

modified default output configurations in accordance with the following tables: 

 

 

 

 

 

Содержание SEMACONNECT 7 Series

Страница 1: ...Series 7 7 8 8 INSTALLATION MANUAL ...

Страница 2: ...REMENTS 5 ELECTRICAL REQUIREMENTS 6 STATION CONNECTION DIAGRAMS 8 COMMUNICATION REQUIREMENTS 9 NETWORK PLATFORM REQUIREMENTS 9 HARDWARE INVENTORY SPECIFICATION AND INSTALLATION 10 PEDESTAL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS 10 PEDESTAL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS 17 WALL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS 28 WALL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS 35 START UP 47 ...

Страница 3: ...of responsibility to comply with all applicable codes and safety standards This document describes the most common installation and mounting methods Contact SemaConnect Inc where it is not possible to perform an installation using the procedures provided in this document SemaConnect Inc is not responsible for damages that may occur or result from installations that are not described in this docume...

Страница 4: ...d or any modification not approved by the manufacturer will void the limited warranty Other than the limited product warranty provided by SemaConnect this manual and the SemaConnect Inc products are provided AS IS and SemaConnect Inc expressly disclaim all implied warranties including any warranty of design merchantability and fitness for a particular purposes and non infringement to the maximum e...

Страница 5: ...ot required All breakers must be non GFCI breakers Anchoring detail is the responsibility of others Anchoring must be capable of minimum weight and height in accordance with the provided table Any seismic wind loading and or snow loading considerations increasing weights or wind profile of unit will be the responsibility of others WEIGHT LBS HEIGHT INCHES SERIES 7 18 OUTPUT CABLES 36 20 5 SERIES 7...

Страница 6: ... SemaConnect EV charging station is listed and labeled through Nationally Recognized Testing Laboratory compliance testing at the maximum or full rated output Each station is capable of continuous full rated output up to its labeled rating or modified default output configurations in accordance with the following tables ...

Страница 7: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com ...

Страница 8: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Station Connection Diagrams DUAL SOURCE INPUT SINGLE SOUCE INPUT ...

Страница 9: ...aConnect EV charging station location Verizon 4G LTE Band 13 RSRP 95 dBm RSRQ 13 dB Band 4 ATT 4G LTE Band 2 Band 4 Band 5 Band 12 Band 13 RSRP 95 dBm RSRQ 13 dB SemaConnect stations do not use 5G cellular or Wi Fi communication protocols Network Platform Requirements To enable modified output configurations or load management configurations SemaConnect must be notified during station Start up enr...

Страница 10: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com HARDWARE INVENTORY SPECIFICATION AND INSTALLATION PEDESTAL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS ...

Страница 11: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Pedestal Mount Inventory Specification ...

Страница 12: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 INSTALL ANCHOR PLATE VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Страница 13: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 REMOVE ACCESS PANEL COVER AND INSTALL PEDESTAL WITH ACCESS PLATE OPENING FORWARD FACING VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Страница 14: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Страница 15: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 INSTALL CABLE RACK ...

Страница 16: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Страница 17: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com PEDESTAL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS ...

Страница 18: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Pedestal Mount with Cable Management System Inventory Specification ...

Страница 19: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 INSTALL ANCHOR PLATE VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Страница 20: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 REMOVE ACCESS PANEL COVER AND INSTALL PEDESTAL WITH ACCESS PLATE OPENING FORWARD FACING VERIFY ALL CONDUCTORS ARE DE ENERGIZED ...

Страница 21: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Страница 22: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 INSTALL CABLE RACK CABLE RACK OPTIONAL WITH CABLE MANAGEMENT SYSTEM ...

Страница 23: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Страница 24: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 6 INSTALL CABLE MANAGEMENT SYSTEM CMS Refer to General Requirements section for Cable Management System Weights ...

Страница 25: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 7 INSTALL CMS PEDESTAL CLAMP ...

Страница 26: ... dwfwdfwfwfwfwffffgd www SemaConnect com 8 INSTALL CABLE MANAGEMENT SYSTEM OUTPUT CABLE CLAMPS 30A 48A Cable Clamp 80A Cable Clamp 18 Cable Install clamp 9 from the output cable J1772 coupler 25 Cable Install clamp 9 from the output cable J1772 coupler ...

Страница 27: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 9 REMOVE CMS COUNTERWEIGHT RETENTION BOLTS ...

Страница 28: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com WALL MOUNT WITHOUT CABLE MANAGEMENT SYSTEM CMS ...

Страница 29: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com Wall Mount Inventory Specification ...

Страница 30: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 REMOVE ACCESS PANEL AND INSTALL WALL MOUNT ASSEMBLY ...

Страница 31: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 CONNECT CONDUIT TO WALL MOUNT ASSEMBLY TRADE SIZE 1 TRADE SIZE ...

Страница 32: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PANEL COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Страница 33: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 INSTALL CABLE RACK ...

Страница 34: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Страница 35: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com WALL MOUNT WITH CABLE MANAGEMENT SYSTEM CMS ...

Страница 36: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com WALL MOUNT WITH CABLE MANAGEMENT SYSTEM INVENTORY SPECIFICATION ...

Страница 37: ...ight 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 1 USING THE DRAWING BELOW MARK ALL AND DRILL ALL ANCHOR CENTERS FOR CMS SUPPORT BRACKETS AND WALL MOUNT BRACKET ASSEMBLY ...

Страница 38: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 2 MOUNT AND SECURE CMS BRACKETS TO WALL Max Anchor Size Ø 0 236 ...

Страница 39: ...Connect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 3 MOUNT AND SECURE CMS TO CMS BRACKETS AND TO FLOOR Refer to General Requirements section for Cable Management System Weights Max Anchor Size Ø 0 236 ...

Страница 40: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 4 REMOVE ACCESS PANEL COVER AND INSTALL WALL MOUNT BRACKET ASSEMBLY AND WALL MOUNT ASSEMBLY ...

Страница 41: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 5 CONNECT CONDUIT TO WALL MOUNT ASSEMBLY ...

Страница 42: ...ALL CHARGING HEAD UNIT Refer to General Requirements section for station weights VERIFY ALL CONDUCTORS ARE DE ENERGIZED COMPLETE ALL ELECTRICAL CONNECTIONS PRIOR TO STEP 4 SEE SYSTEM REQUIREMENTS SECTION FOR CONNECTION DETAILS RE INSTALL ACCESS PLATE COVER UPON COMPLETION OF ELECTRICAL CONNECTIONS ...

Страница 43: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 7 INSTALL CABLE RACK CABLE RACK OPTIONAL WITH CMS ...

Страница 44: ... 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 8 INSTALL CABLE HOLSTERS Note A 8 200 MM SHANK 4 MM ALLEN WRENCH IS REQUIRED TO ATTACH THE CABLE HOLSTERS TO THE CHARGING STATION ...

Страница 45: ... dwfwdfwfwfwfwffffgd www SemaConnect com 9 INSTALL CABLE MANAGEMENT SYSTEM OUTPUT CABLE CLAMPS 30A 48A Cable Clamp 80A Cable Clamp 18 Cable Install clamp 9 from the output cable J1772 coupler 25 Cable Install clamp 9 from the output cable J1772 coupler ...

Страница 46: ...Copyright 2022 SemaConnect LLC All rights reserved dwfwdfwfwfwfwffffgd www SemaConnect com 10 REMOVE CABLE MANAGEMENT SYSTEM CMS COUNTERWEIGHT RETENTION BOLTS ...

Страница 47: ... installation station registration and load management and or modified output configurations have been completed if applicable the SemaConnect station is ready to be energized After energizing the station both at a glance LED lights should illuminate BLUE If both station at a glance LED lights do not illuminate BLUE please refer to the following troubleshooting guidance No LED lights or LCD screen...

Страница 48: ...nce Use clean soft cloth along with mild detergent to wash the dirt off Pour water gently from the top and use a wet dry cloth to clean all the sides Do not use excessive water pressure Do not use strong detergents or any other chemicals acids petrol thinner or any other solvent Avoid exerting excessive pressure on the device while cleaning Do not open the device Do not use a vacuum cleaner ...

Отзывы: