5 BBL Single Wall Hybrid Brewhouse V6
© Blichmann Engineering, LLC 2022
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
4
DANGER
Electrical
Hazard.
DANGER
Lock Out
for Safety.
HLT
BOIL
HLT
MASH
BOIL
HEATERS ON
HEATER ON
HLT HEATERS 1-2-3
BOIL HEATER 1-2-3
ON
OFF
AUTO
ON
OFF
AUTO
HLT HEATERS 1-3
DIGITAL TIMER
BOIL HEATER 1-2-3
1
1-2
1-2-3
1
1-2
1-2-3
F1
F2
D
P
Kettle Temperature
Controllers (PID’s)
Heater Control
Selector Switches
Heater Power
Selector Switches
Timer Selector Switch
Heaters ON
Indicator Lamps
Warning:
Always follow ALL local codes and regulations for installation of this panel. We highly recommend hiring a certified
electrician for this work! This panel is designed for 230 VAC single phase power only.
The back of the panel has 4 holes for affixing the panel to the wall of the brewhouse or onto a suitable stand. Mounting hardware
or stand is not included. The image below indicates the locations of the main components.
SINGLE PHASE CONTROLLER
THREE PHASE CONTROLLER
Warning: Always follow ALL local codes and regulations for installation of this panel. We highly recommend hiring a certified
electrician for this work! This panel is designed for 208/230 VAC three phase power only. Contact us for single phase system
options.
The back of the panel has 4 holes for affixing the panel to the wall of the brewhouse or onto a suitable stand. Mounting hardware
or stand is not included. The image below indicates the locations of the main components.