The torino
Page 14
Through Roof Framing
Maintain 10” opening relative to the pitch of
the roof.
10” square
Use a suitable round or square support
through the roof. Ensure adequate heat
shield protection is provided.
Termination Above Roof
Consult local codes for minimum vent cap
height above the roof, vent must be a
minimum 2’ from any wall.
install the flashing with upper portion slid
under the roofing material and the lower
portion over the roofing material.
Note: Do not fasten down until the final
adjustments to the vent have been
made.
INSTALLATION INSTRUCTIONS
Cont...
Содержание TORINO
Страница 6: ...The torino Page 6 APPLIANCE DIMENSIONS ...
Страница 24: ...The torino Page 24 WIRING DIAGRAMS INTERMITTENT PILOT VALVE Optional Wall thermostat interrupt green wire ...
Страница 25: ...The torino Page 25 WIRING DIAGRAM 120 V AC ...
Страница 26: ...The torino Page 26 LIGHTING INSTRUCTIONS Intermittent Pilot ...
Страница 27: ...The torino Page 27 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions Fig 3 Receiver body ...
Страница 28: ...The torino Page 28 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Страница 29: ...The torino Page 29 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Страница 30: ...The torino Page 30 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Страница 37: ...The torino Page 37 FUEL CONVERSION ...
Страница 47: ...The torino Page 47 ...
Страница 48: ...The torino Page 48 NOTES SERVICE HISTORY DATE CORRECTIVE ACTION INCLUDE REPLACEMENT PARTS ...