180-BX24.1 v1.00
May 27, 2020
Page 19
BX24.1
INSTALLATION INSTRUCTIONS
BX24.1 PEDESTAL KITS (both S.Z2126 & S.Z2133)
NOTE: EITHER S.Z2126 PEDESTAL KIT OR
S.Z2133 LEG BASE KIT MUST BE INSTALLED
BEFORE STOVE CAN BE DUCTED AND READY
FOR USE.
TOOLS NEEDED FOR INSTALLATION: 7/16”
wrench or socket wrench
INSTALLATION
1.
Lean stove rearwards and lay flat on back
to gain access to stove bottom.
NOTE: Use
extreme caution when leaning the stove over
to avoid injury or damage to the flooring
or appliance. Place cardbaord inside the
firebox to support bricks when leaning the
stove.
2. Unpackage pedestal kit and postion beneath
underside of stove bottom, keeping centered left
to right.
3. With the x4 mounting holes in pedestal kit
aligned with the x4 pem nuts in stove bottom,
fasten all four 1/4”-20 hex head cap screws with
1/4” washers into the stove base (hardware
included w/ pedestal kits).
4. Ensure pedestal is secured in desired position,
then lean stove forwrads and up onto the
pedestal.