background image

4

www.blaubergventilatoren.de

FRESHBOX 60

UNIT DESIGN AND OPERATING LOGIC 

Fig. 1. Unit design

Fig. 2. Operation logic

DELIVERY SET

 

Unit - 1 item;

 

Sensor speed switch -  1 item;

 

Power cable -  1 item;

 

Fasteners (screw 5.0x50 – 2 items; dowel 8x40 - 2 items); 

 

Operation manual - 1 item;

 

Master plate - 1 item;

 

Packing box - 1 item.

The compact casing is made of polymer coated steel and has a 15 mm 

thermal and sound insulation of PE foam film. The front panel  serves for ac-

cessing to the unit internals.

The unit is powered through an integrated power supply unit with a wide 

range of supply voltage from 100 to 240 V and frequency 50-60 Hz. The unit 

is supplied with a power cord with a standard adapter and is compatible with 

round Ø125 mm air ducts.

Axial EC fans provide air supply and air extract. EC motor technologies 

meet the latest engineering demands for energy saving and for high-efficient 

ventilation. Due to EC technology the single room air handling unit is featured 

with a low energy demand. The fan motors are equipped with built-in thermal 

overheating protection with automatic restart and ball bearings for longer 

service life.

The unit incorporates a plate counter-flow plastic heat exchanger with 

large surface area and high efficiency. Recuperating efficiency reaches 79%. 

The air flows are fully separated within the heat exchanger. Odours and con-

taminants contained in the extract air are not transferred to the supply air 

flow.

Heat recovery is based on the utilization of the thermal energy of the ex-

tract air for heating up the supply air. The extract air transfers most of its heat 

to the intake air flow. This reduces thermal energy losses in cold seasons. In 

summer the heat exchanger performs reverse and transfers cold from the 

cooled extract air for cooling the warm intake air. This contributes to better 

performance of the air conditioner in ventilated premises.

The integrated protection system is used for freezing protection of the 

unit in cold seasons. The temperature sensor is installed in the section behind 

the heat exchanger before the extract fan and is used for freezing  protection 

of the unit. If the exhaust temperature drops below +3 °C the heat exchanger 

freezing danger is registered. In this case the supply fan is turned off and the 

unit operates in exhaust mode which enables the heat exchanger get warmed 

up with extract air. After freezing danger is off the unit reverts to the standard 

operation mode. 

The unit is equipped with BLAUBERG SGR-3/1 sensor speed  switch for the 

unit speed changeover.

Supply fan

Automation unit

Exhaust fan

Heat exchanger  

Supply filter   

Front panel    

Extract filter

Intake air

Extract air

Supply filter

Extract filter

Heat exchanger

Содержание FRESHBOX 60

Страница 1: ...OPERATION MANUAL FRESHBOX 60 SINGLE ROOM AIR HANDLING UNIT WITH HEAT RECOVERY ...

Страница 2: ...ansportation rules 3 Manufacturer s warranty 3 Unit design and operating logic 4 Delivery set 4 Technical data 5 Mounting and operation guidelines 5 Connection to power mains and control 8 Maintenance 9 Troubleshooting 9 Acceptance certificate 10 Connection certificate 10 Warranty card 10 CONTENTS ...

Страница 3: ...ection Technical data Do not close or block the unit intake or exhaust vent not to disturb the normal air passage Do not sit on the unit and do not put objects on the unit Follow the manual guidelines to ensure trouble free operation and long service life of the product Hazardous parts access and water ingress protection standard IP22 STORAGE AND TRANSPORTATION RULES Transportation of the unit is ...

Страница 4: ...g efficiency reaches 79 The air flows are fully separated within the heat exchanger Odours and con taminants contained in the extract air are not transferred to the supply air flow Heat recovery is based on the utilization of the thermal energy of the ex tract air for heating up the supply air The extract air transfers most of its heat to the intake air flow This reduces thermal energy losses in c...

Страница 5: ... construction stage It includes two plastic air ducts each 500 mm long and two master plates for marking the holes on inner and outer wall sides The mounting set MS2 FRESHBOX 60 is specially designed for mounting of the unit in a ready built premise It includes two plastic air ducts 500 mm long a master plate for matching holes and an outer ventilation hood AH FRESHBOX 60 that prevents ingress of ...

Страница 6: ... the solidification time in the product specification remove the master plates At the inner wall cut the protruding parts of the air ducts to be flush with the wall On outer wall side the air ducts must protrude by 10 mm to prevent condensate dropping on the wall 7 Mounting sequence of the unit a take off the front cover and remove the heat exchanger fig 8 b connect the unit spigots to the air duc...

Страница 7: ... mounting set includes plastic air duct Ø 125 mm 500 mm long 2 items paper master plate 1 item outer ventilation box AH FRESHBOX 60 1 item screw and dowel 8x40 4 items Mounting sequence of MS2 FRESHBOX 60 set 1 Fix the master plate from the delivery set on inner wall side with a sealing tape on required level fig 5 2 Use the master plate to mark two Ø 140 mm holes for the air ducts and two Ø 8 mm ...

Страница 8: ...uch a respective speed button to change the selected speed The respective speed button has blue highlighting Touch a current fan speed button once again to turn the air handling unit off The sensor panel has no light indication when the unit is off Every time the sensor panel is touched a sound signal is generated The control unit is installed under the protecting panel of the air handling unit fi...

Страница 9: ...peed switch mounting Mounting sequence of the sensor speed switch fig 13 1 Carefully undo the latches of the switch front panel with a screwdriver 2 Remove the front panel 3 Route the cable to the installation place of the speed switch 4 Fix the back panel to the wall through the fixing holes 5 Connect the control cable to the speed switch following the wiring diagram fig 12 6 Install the speed sw...

Страница 10: ...rective 2006 95 EC 73 23 EEC and CE marking Directive 93 68 EEC on the approximation of the laws of the Member States relating to electromagnetic compatibility This certificate is issued following test carried out on samples of the product referred to above Approval mark Manufacturing date____________________ The single room air handling unit with heat recovery FRESHBOX 60 is connected to power ma...

Страница 11: ..._______________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ ________________...

Страница 12: ...www blaubergventilatoren de FRESHBOX 60 v 5 3 EN ...

Отзывы: