background image

MANUFACTURER’S WARRANTY

The product is in compliance with EU norms and standards on low voltage guidelines and electromagnetic compatibility. We hereby 
declare that the product complies with the provisions of Electromagnetic Compatibility (EMC) Directive 2014/30/EU of the European 
Parliament and of the Council, Low Voltage Directive (LVD) 2014/35/EU of the European Parliament and of the Council and CE-marking 
Council Directive 93/68/EEC. This certificate is issued following test carried out on samples of the product referred to above.
The manufacturer hereby warrants normal operation of the unit for 24 months after the retail sale date provided the user's observance 
of the transportation, storage, installation, and operation regulations. Should any malfunctions occur in the course of the unit operation 
through the Manufacturer's fault during the guaranteed period of operation, the user is entitled to get all the faults eliminated by the 
manufacturer by means of warranty repair at the factory free of charge. The warranty repair includes work specific to elimination of faults 
in the unit operation to ensure its intended use by the user within the guaranteed period of operation. The faults are eliminated by means 
of replacement or repair of the unit components or a specific part of such unit component.

The warranty repair does not include: 

•  routine technical maintenance
•  unit installation/dismantling 
•  unit setup
To benefit from warranty repair, the user must provide the unit, the user's manual with the purchase date stamp, and the payment 
paperwork certifying the purchase. The unit model must comply with the one stated in the user’s manual. Contact the Seller for warranty 
service. 

The manufacturer’s warranty does not apply to the following cases:

•  User’s failure to submit the unit with the entire delivery package as stated in the user’s manual including submission with missing 

component parts previously dismounted by the user.

•  Mismatch of the unit model and the brand name with the information stated on the unit packaging and in the user's manual.
•  User’s failure to ensure timely technical maintenance of the unit.
•  External damage to the unit casing (excluding external modifications as required for installation) and internal components caused 

by the user.

•  Redesign or engineering changes to the unit.
•  Replacement and use of any assemblies, parts and components not approved by the manufacturer.
•  Unit misuse.
•  Violation of the unit installation regulations by the user.
•  Violation of the unit control regulations by the user.
•  Unit connection to power mains with a voltage different from the one stated in the user's manual.
•  Unit breakdown due to voltage surges in power mains.
•  Discretionary repair of the unit by the user.
•  Unit repair by any persons without the manufacturer’s authorization.
•  Expiration of the unit warranty period.
•  Violation of the unit transportation regulations by the user.
•  Violation of the unit storage regulations by the user.
•  Wrongful actions against the unit committed by third parties.
•  Unit breakdown due to circumstances of insuperable force (fire, flood, earthquake, war, hostilities of any kind, blockades).
•  Missing seals if provided by the user’s manual.
•  Failure to submit the user’s manual with the unit purchase date stamp.
•  Missing payment paperwork certifying the unit purchase.

FOLLOWING THE REGULATIONS STIPULATED HEREIN WILL ENSURE A LONG AND 

TROUBLE-FREE OPERATION OF THE UNIT.

USER’S WARRANTY CLAIMS SHALL BE SUBJECT TO REVIEW ONLY UPON 

PRESENTATION OF THE UNIT, THE PAYMENT DOCUMENT AND THE USER’S MANUAL 

WITH THE PURCHASE DATE STAMP.

BlauAir rh

10

www.blaubergventilatoren.de

Содержание BL02 RH 1500

Страница 1: ...Air handling unit BlauAir RH USER S MANUAL EN ...

Страница 2: ...ed to install make electrical connections and maintain ventilation units Do not attempt to install the product connect it to the mains or perform maintenance yourself This is unsafe and impossible without special knowledge Disconnect the power supply prior to any operations with the unit All user s manual requirements as well as the provisions of all the applicable local and national construction ...

Страница 3: ...rits gasoline insecticides etc Do not close or block the intake or extract vents in order to ensure the efficient air flow Do not sit on the unit and do not put objects on it The information in this user s manual was correct at the time of the document s preparation The Company reserves the right to modify the technical characteristics design or configuration of its products at any time in order t...

Страница 4: ...s materials coarse dust soot and oil particles or environments favourable for the formation of hazardous substances toxic substances dust pathogenic germs DESIGNATION KEY BlauAir BL02 R H 2500 HW CDX L S30 Automation type S30 kVent with thTune control panel S31 kVent S32 kVent with pGDE control panel Service modification L left sided modification R right sided modification Cooler type _ no cooler ...

Страница 5: ... the water drainage and connected pipelines must be provided during sub zero ambient temperatures if the unit is equipped with an air cooler The heat medium temperature in the water heat exchangers if available must be sufficient to prevent its freezing Hazardous parts access and water ingress protection rating IP54 for the unit motors IP42 for the assembled unit connected to the air ducts without...

Страница 6: ...TION LOGIC UNIT DESIGN 1 5 6 7 2 3 4 1 1 protective dampers with electric actuator 2 extract fan 3 rotary heat exchanger 4 supply filter 5 control unit 6 extract filter 7 supply fan BlauAir RH 6 www blaubergventilatoren de ...

Страница 7: ...ight sided modification service side view Exhaust air Intake air Supply air Extract air Supply air Exhaust air Intake air Extract air Connection of the air ducts is shown with the stickers of the respective colours yellow for the extract air duct green for the intake air duct red for the supply air duct and brown for the exhaust air duct During installation works sufficient maintenance and service...

Страница 8: ...ation 3 6 months after commissioning of the unit it must be inspected by a service expert for planned preventive maintenance of the unit Next maintenance operations must be conducted at least every 6 12 months Maintenance periodicity is determined by a service expert depending on operation conditions of the unit Dust deposits on the inner parts of the unit especially in the electric heater may lea...

Страница 9: ...ations to prevent possible damage to the unit Follow the handling requirements applicable for the particular type of cargo The unit can be carried in the original packaging by any mode of transport provided proper protection against precipitation and mechanical damage The unit must be transported only in the working position Avoid sharp blows scratches or rough handling during loading and unloadin...

Страница 10: ...cturer s warranty does not apply to the following cases User s failure to submit the unit with the entire delivery package as stated in the user s manual including submission with missing component parts previously dismounted by the user Mismatch of the unit model and the brand name with the information stated on the unit packaging and in the user s manual User s failure to ensure timely technical...

Страница 11: ..._________ unit is installed pursuant to the requirements stated in the present user s manual Installation Stamp Company name Address Phone Number Installation Technician s Full Name Installation Date Signature The unit has been installed in accordance with the provisions of all the applicable local and national construction electrical and technical codes and standards The unit operates normally as...

Страница 12: ...www blaubergventilatoren de B192 2EN 02 ...

Отзывы: