Operating Instructions                                                     1-8DEC 230V 

Edging Mode 

 
 
 

6.1  Edging Mode 

 
Refer to Figure Number 5 
 

The model 1-8DEC 208/230V is capable of cleaning surfaces within 1 / 2 inch of 
vertical obstructions.  (This is along the side of the machine.  The 1-8DEC can 
be pushed as close as 1-1/2 inches from the front of the machine.)  Performing 
the following steps sets up the edging mode: 

 

1.  Remove  the  two  hex  screws  holding  the  retainer,  seal  and  magnet  on  the 

side  of  the  machine  where  the  edging  is  required.    This  requires  a  5-mm 
metric hex key.  Be careful to keep abrasive from entering the holes in which 
the screws were secured.  You may want to cover these two holes with duct 
tape while in the edging mode to protect the threads.   

  

2.  Move the machine to the area in which the edging will be done and see if the 

machine can be moved freely.  Adjust the height of the machine if necessary. 

 

3.  Begin cleaning in the normal fashion.  Do not blast when the machine is away 

from  the  vertical  surface  in  the  edging  mode  since  the  magnetic  seal  is  no 
longer  present.    Abrasive  will  disperse  more  readily  from  the  side  if  the 
magnet is not in place.  Keep in mind that the machine will tend to lose more 
abrasive  while  in  the  edging  mode  since  the  magnetic  seal  has  been 
removed. 

 
 

NOTE:  Do not use the machine for normal blasting when it has been prepared for 
edging.  The magnet, seal and retainer must be reinstalled first. 
 
CAUTION:    Close  the  abrasive  valve  before  moving  the  1-8DEC  away  from  the 
vertical  surface.    Failure  to  do  so  may  expose  nearby  personnel  to  flying 
abrasive. 
 
 
 

29

 

Содержание 1-8DECMKI

Страница 1: ...MODEL 1 8DECMKI Shot Blasting System WALK BEHIND MANUAL PUSH Trust the Original Surface Preparation Experts 800 256 3440 blastrac com...

Страница 2: ...Operating Instructions 1 8DEC 230V Safety Instructions Section 1 1 1 Safety Instructions 1 2 Safety Mechanical 1 3 Safety Electrical 1 4 Safety Ventilation 1...

Страница 3: ...ctured for specific floor preparation applications The engineering design of this airless media blast machine incorporates several basic elements These include the airless media blast wheel media recy...

Страница 4: ...o recommended Long sleeve shirts and safety shoes should be worn and loose clothing should be avoided The abrasive used in the machine impacts the work surface at high velocity Any leakage during norm...

Страница 5: ...d immediately to help keep the work area free of loose abrasive 6 Any condition s that may result in additional damage to the equipment or cause injury to nearby personnel should be repaired immediate...

Страница 6: ...in this equipment Never use oversized fuses or bypass any fuses to operate the machinery Always refer to the electrical drawings provided for the individual machines for proper size and type of overcu...

Страница 7: ...damage machine components Your Blastrac Blast Unit can be operated on 208 230 volt single phase 60 Hertz power ONLY Do not attempt to operate this equipment on 50 Hertz power A 50 Hertz blast unit is...

Страница 8: ...Operating Instructions 1 8DEC 230V Operator Responsibilities Section 2 2 1 Operator Responsibilities 7...

Страница 9: ...operator shall provide the necessary blasting media in accordance with the recommendations of a Blastrac technician so that the machine will operate at maximum efficiency 4 The operator shall be respo...

Страница 10: ...asive Control Valve 3 4 Blast Unit Rebound Chamber Plenum 3 5 Blast Unit Deflector Plate Hopper 3 6 Blast Unit Abrasive Seals 3 7 Blast Unit Chassis 3 8 Blast Unit Electrical Control Panel 3 9 Dust Co...

Страница 11: ...nto a specially designed chamber called the separator Inside this chamber an air wash cleans the abrasive and allows the contaminants to be extracted back to the dust collector The clean abrasive is t...

Страница 12: ...ge is very important when setting up the blast pattern covered in Section 5 An analog ammeter provides readout of the current of electric motor that drives the blast wheel This provides a direct indic...

Страница 13: ...at the bottom of the plate and effectively absorbs any residual force left in the moving mixture The contaminated abrasive then falls through a curtain of high velocity clean air which physically sep...

Страница 14: ...is drawing This allows the operator to monitor and control abrasive flow 2 Blast Wheel Start Stop Run Switch Allows operator to start or stop the blast wheel 3 Abrasive Control Valve Throttle Used to...

Страница 15: ...ector during normal operation for the reasons listed below Cools blast machine components Helps remove residual abrasive and dust from work surface Collects and separates dust and contaminants from re...

Страница 16: ...o the ventilation system are The skirts around the blast housing should be kept in good repair The seals around the separator lid should be checked regularly The hose connections to the blast unit and...

Страница 17: ...ac shot cleaning systems This steel abrasive is made of high quality martensitic steel to provide long operating life and minimal abrasive breakdown The selection of proper abrasive is very important...

Страница 18: ...17...

Страница 19: ...18...

Страница 20: ...19...

Страница 21: ...Operating Instructions 1 8DEC 230V Start Up Procedures and Precautions Section 4 4 1 Start Up 4 2 Blast Cleaning 4 3 Shut Down 20...

Страница 22: ...the shot hopper of the blast unit to be sure that the shot has been drained At the end of each job the shot hopper should be emptied 4 Check the blast wheel control cage feed spout liners seals and ho...

Страница 23: ...pment Be sure that the surface is moisture free Blastrac machinery is designed to work on clean dry surfaces only 14 Make certain that the abrasive control valve is in the closed position Remove the s...

Страница 24: ...rip is uneven refer to Section 5 Blast Pattern to adjust the HOT SPOT 4 2 Blast Cleaning 1 Ease the abrasive valve open while monitoring the ammeter readout Do not exceed the amperage rating for the o...

Страница 25: ...machine may change when the blast components start to wear The operator should always note the blast pattern during normal cleaning and make adjustments or replace parts when necessary See Section 5...

Страница 26: ...Operating Instructions 1 8DEC 230V Setting the Correct Blast Pattern Section 5 5 1 Setting the Correct Blast Pattern 25...

Страница 27: ...ctions These kits must be periodically replaced to ensure that they provide the proper blast pattern and to eliminate excessive wear which can cause internal component and bearing unit damage 3 Abrasi...

Страница 28: ...teel plate beneath the machine and blast at full amperage for about 45 seconds Do not move the machine during this test The resulting hot spot should be centered as it appears on Figure B If the hot s...

Страница 29: ...Operating Instructions 1 8DEC 230V Edging Mode Section 6 6 1 Edging Mode 28...

Страница 30: ...the edging mode to protect the threads 2 Move the machine to the area in which the edging will be done and see if the machine can be moved freely Adjust the height of the machine if necessary 3 Begin...

Страница 31: ...30...

Страница 32: ...Operating Instructions 1 8DEC 230V Equipment Calibration Section 7 7 1 Equipment Calibration 31...

Страница 33: ...etting the Correct Blast Pattern figures A B and C 3 Abrasive Selection Recommendations Steel Shot Size Brush blast of smooth concrete S 170 to S 280 smaller size will produce a brighter etch Rough co...

Страница 34: ...208 230 volts should not exceed 17 amps To help ensure that this limit is not exceeded the abrasive control handle has a screw lock adjustment to keep the abrasive valve from opening too far Once the...

Страница 35: ...Operating Instructions 1 8DEC 230V Wear Parts Section 8 8 1 Wear Parts 8 2 Maintenance Log 34...

Страница 36: ...Blast Wheel 5 Hrs Blades Worn by more than 50 Remove hub bolt and replace Feed Spout 50 Hrs Thin at Wheel Entry Remove and replace Control Cage 5 Hrs Eroded Edges Remove and replace adjust pattern Re...

Страница 37: ...an or replace Checked OK Change Airline Inspect for leaks Checked OK Change Shot valve Inspect Checked OK Change Seals Inspect for wear Checked OK Change Bearings Inspect set screws and grease Checked...

Страница 38: ...Operating Instructions 1 8DEC 230V Blast Wheel Replacement Section 9 9 1 Blast Wheel Replacement 37...

Страница 39: ...tween the blast wheel and the control cage Remove the control cage mounting assembly 4 Remove the socket head cap screw and lock washers from the blast wheel and remove the blast wheel 5 Check the whe...

Страница 40: ...mbly of the blast wheel and its associated parts are illustrated on Figure Number 2 These parts must be maintained in good operating condition in order to enhance the life of the bearing unit and the...

Страница 41: ...rating Instructions 1 8DEC 230V Troubleshooting Section 10 10 1 Troubleshooting Blast Unit 10 2 Troubleshooting Ventilation System Dust Collector 10 3 Vacuum Adjustment 10 4 Troubleshooting Electrical...

Страница 42: ...ken blades Replace wheel kit Check separator and ventilation system Chipped or broken blades will permanently unbalance the blast wheel and can cause damage to other components Change wheel kit immedi...

Страница 43: ...stantial percentage of fines and contaminants Check ventilation Check for obstructions in the abrasive feed i e feed spout abrasive control valve and separator screen May be worn Replace wheel kit Che...

Страница 44: ...on steering handle to raise machine to clear small obstructions or uneven work surfaces Shut abrasive valve if obstruction cannot be cleared Pull back machine to clear Use caution when raising seal du...

Страница 45: ...it properly 10 3 Vacuum Adjustment For normal concrete surfaces Blastrac does not recommend using more than the 25 feet of exhaust hose supplied with the blast system Adding additional hose can cause...

Страница 46: ...relay tripped Broken damaged or loose wiring Long extension cord being used Check main power cable at electrical source Must be 208 230 volt 60hz single phase power 20 amp service Reset overload rela...

Страница 47: ...Operating Instructions 1 8DEC 230V Electrical Troubleshooting Section 11 11 1 Electrical Troubleshooting 11 2 General 11 3 Blast Unit 46...

Страница 48: ...y must be locked off tied off or otherwise neutralized to be considered harmless 2 It is important that operators and maintenance personnel receive regular equipment safety training 3 AND have a thoro...

Страница 49: ...olts that the cable length not exceed 50 feet If a longer cable is necessary contact your Blastrac specialist for recommendations on new cable dimensions 11 3 Blast Unit Blast Wheel will not operate L...

Страница 50: ...Operating Instructions 1 8DEC 230V Specifications Section 12 12 1 Specifications 49...

Страница 51: ...eight excluding handle 36 inches Height including handle in normal position 37 inches Width 12 3 8 inches Weight 190 pounds Vacuum Hose Length 25 feet Production Capacity Approx 215 square feet hour C...

Страница 52: ...noted on shipping receipt Hand Tool Products Blastrac warrants its BLASTRAC Hand Tool Products including hand grinders and accessories against defects in material and workmanship under normal and prop...

Страница 53: ...otors batteries tires and all other parts See component manufacture warranty 7 Blastrac reserves the right to make product changes or improvements without prior notice and without undertaking any obli...

Страница 54: ...Warranty Registration IMPORTANT To ensure that your Blastrac machine is covered under warranty please provide the information recorded here by registering online at blastrac com or complete this page...

Отзывы: