INTRODUCTION

DESCRIPTION

The Rotoblast tool cleans the interior of pipes up to 40’ long and ranging in size from 8” (210 mm) 

to 35” (890 mm) I.D. The tool connects to most abrasive blasting machines in place of a standard 

nozzle. As the tool passes through the length of the pipe being cleaned, abrasive is ejected by two 

special nozzles mounted on a rotating head. Optimal rotating speed is controlled by the braking 

system. An adjustable centring carriage supports the tool through the pipe internal. The chart 

below shows the recommended centring legs, nozzle sizes and compressor capacities for different 

pipe diameters.

Failure to perform proper maintenance, particularly when dust seals are involved, will result 

in severe damage to this tool. Read all the instructions carefully.

WARNING

SET-UP AND OPERATION

Equipment and materials required:

The system set-up for the Rotoblast operation is the same as for any other blast cleaning 

operation, i.e. an air compressor, an optional moisture separator, a blast machine, a helmet air 

supply system.
Consult the chart below to determine the proper carriage size.
Abrasive to be used for optimal operation is between 16 (1.2 mm) to 35 (0.5 mm) mesh size, 

except for Aluminum Oxide and Silicon Carbide (sand). These two abrasives shorten the tool’s life 

unacceptably.

Centering carriage:

The carriage fits to the Rotoblast as one assembly.

It’s consists of two collars, three two-wheel roller bars and four sets of centring legs  

(6 legs p/set).

PIPE I.D.

NOZZLE SIZE

CENTRING LEGS

COMPRESSOR SIZE

8” - 10” / 210 mm-260 mm

6.0mmx45 orifices

12 cm

250 cfm / 7 cbm

11”-15” / 260 mm-380 mm

8.0mmx45 orifices

19 cm

365 cfm / 10.5 cbm

15”-23” / 380 mm-580 mm

9.5mmx45 orifices

29 cm

600 cfm / 17 cbm

23”-35” / 580 mm-890 mm

9.5mmx100 orifices

46 cm

600 cfm / 17 cbm

Содержание Rotoblast

Страница 1: ...Rotoblast Internal Pipe Cleaner www BlastOne com INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...Keep unprotected workers out of the blast area 7 Before blasting Check fittings and hose for wear Safety wire couplings together Check helmet filters and air supply Check pop up valve for alignment Te...

Страница 3: ...ARNING SET UP AND OPERATION Equipment and materials required The system set up for the Rotoblast operation is the same as for any other blast cleaning operation i e an air compressor an optional moist...

Страница 4: ...e locking nut pos 14 for the rear end plate pos 11 Couple the blast hose to one end of the pipe lance and the Rotoblast to the other end with CFT couplings pos 22 23 or leave the lance out Pipes to be...

Страница 5: ...r re assembly set the proper drag TUNGSTEN CARBIDE WASHER POS 12 Replace the washer before the opening gets wider than the one of the tube casting NOZZLES POS 29 33 Rotate both blast nozzle turn each...

Страница 6: ...ather dust seal too loose Replace brake pos 5 Replace Nozzle Tighten rubber lined nipple pos 13 Vibrating unit One nozzle is clogged Unbalanced nozzle orifices Loose centring carriage Remove obstructi...

Страница 7: ...7 TROUBLESHOOTING...

Страница 8: ...9 5066 Email sales au blastone com www BlastOne com AUSTRALIAN OFFICES Adelaide Brisbane Darwin Mackay Melbourne Perth Sydney Newcastle BLASTONE INTERNATIONAL 4510 Bridgeway Avenue Columbus Ohio 43219...

Отзывы: