background image

5

MAINTENANCE

LEATHER DUST SEAL (POS.10)

The seal must be kept under adequate pressure to protect the bearings. It must never be allowed to 

wear trough. On a new tool with your choice of abrasive, check the leather dust seal every 3 hours 

for wear. Drag should be checked before the cleaning of each new pipe.
To replace the leather dust seal, loosen lock nut (pos.14) and unscrew the rubber lined nipple 

(pos.13). Now remove the rear end plate (pos.11).
Be careful with the tungsten Carbide washer (pos.12), do not drop it.
Clean the exposed bearing seal (pos.9) and the grooved end to the tube casting (pos.6).
Lubricate the exposed parts with Vaseline or cup grease and install a new leather seal (pos.10) with 

the smooth side towards the bearing seal (pos.9)
Also when you replace the bearing seal (pos.9) position the lip inside the bearing to the end off the 

tube (pos.6) on the side off the rera end plate (pos.11). After re-assembly, set the proper drag.

TUNGSTEN CARBIDE WASHER (POS.12)

Replace the washer before the opening gets wider than the one of the tube casting.

NOZZLES (POS.29-33)

Rotate both blast nozzle ¼ turn each day to create even nozzle wear for longer nozzle life.

(Mounting the nozzle you can use Teflon tape)

NOZZLE HEAD (POS.1) AND PLUG (POS.2)

Replace the nozzle head plug (pos.2) every 8 hours, unless experienced longer or shorter

life (life is influenced by operating pressure, type of abrasive and type of nozzle).

Also replace the nozzle head when it’s worn out. When removing or replacing either the nozzle 

head or plug, remove the set screw (pos.17) from the brake housing (pos.3) and insert a proper size 

screwdriver into the hole to prevent the tube casting from turning.

BRAKE LINING (POS.5)

Inspect this part daily. Replace before it wears so thin that it damages the brake shoe or housing 

(pos.3)

LOCKRING / BEARING SEAL (POS.7 & POS.9)

To replace tube casting (pos.6) or bearing (pos.8), the lock ring (pos.7) must be removed from the 

tube after the bearing seal (pos.9).
Never re-use the lock ring (pos.7) or bearing seal (pos.9).

Содержание Rotoblast

Страница 1: ...Rotoblast Internal Pipe Cleaner www BlastOne com INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...Keep unprotected workers out of the blast area 7 Before blasting Check fittings and hose for wear Safety wire couplings together Check helmet filters and air supply Check pop up valve for alignment Te...

Страница 3: ...ARNING SET UP AND OPERATION Equipment and materials required The system set up for the Rotoblast operation is the same as for any other blast cleaning operation i e an air compressor an optional moist...

Страница 4: ...e locking nut pos 14 for the rear end plate pos 11 Couple the blast hose to one end of the pipe lance and the Rotoblast to the other end with CFT couplings pos 22 23 or leave the lance out Pipes to be...

Страница 5: ...r re assembly set the proper drag TUNGSTEN CARBIDE WASHER POS 12 Replace the washer before the opening gets wider than the one of the tube casting NOZZLES POS 29 33 Rotate both blast nozzle turn each...

Страница 6: ...ather dust seal too loose Replace brake pos 5 Replace Nozzle Tighten rubber lined nipple pos 13 Vibrating unit One nozzle is clogged Unbalanced nozzle orifices Loose centring carriage Remove obstructi...

Страница 7: ...7 TROUBLESHOOTING...

Страница 8: ...9 5066 Email sales au blastone com www BlastOne com AUSTRALIAN OFFICES Adelaide Brisbane Darwin Mackay Melbourne Perth Sydney Newcastle BLASTONE INTERNATIONAL 4510 Bridgeway Avenue Columbus Ohio 43219...

Отзывы: