User Manual
Publication date: March, 2006
Revision A2
11
2. Installation
2-1. Starting 3-Slot 24 Fast Et 2 Gigabit L2 Managed
Switch with Redundant Power Up
This section will give users a quick start for:
-
Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
At the beginning, please do first:
⇒
Wear a grounding device to avoid the damage from electrostatic discharge
•
Installing Optional 8-port FE TP/Fiber Modules and SFP
Fiber Transceiver to
the L2 Managed Switch
Note: If you have no modules, please skip this section.
•
Connecting the SFP Module to the Chassis:
The optional 8-port FE TP/Fiber Modules, Gigabit SFP modules are hot
swappable, so you can plug or unplug it before or after powering on.
1. Verify that the 8-port FE TP/Fiber Module, SFP module is the right model
and conforms to the chassis
2. Slide the module along the slot. Also be sure that the module is properly
seated against the slot socket/connector
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
slot(s)
5. Have the power ON after the above procedures are done
Fig. 2-1 Installation of Optional 8-port FE TP/Fiber Module and Gigabit SFP Fiber Transceiver
Содержание 3-Slot 24 Fast Ethernet + 2 Gigabit L2 Managed Switch with Redundant Power
Страница 1: ...3 Slot 24 Fast Ethernet 2 Gigabit L2 Managed Switch with Redundant Power User s Manual Release 2 08 ...
Страница 6: ...vi ...
Страница 8: ......
Страница 157: ...User Manual Publication date March 2006 Revision A2 149 Fig 4 1 Fig 4 2 ...
Страница 254: ......
Страница 255: ......