15
CHAPTER 4: Operation
4. Operation
Once you have installed the 10/100 Physical Layer Ethernet Switch, you are ready
to operate it. First, notice where the AC power switch, keypad, and indicators are
located on the switch. If you have the 32-port model, also notice its LCD display.
Next, follow the instructions in
Sections 4.1
through
4.3
to operate the switch.
Finally, read
Sections 4.4
and
4.5
for instructions on how to configure the switch.
4.1 AC Power Switch
The first thing you must do is power on the switch. The power switch is located on
the rear panel. Setting the switch to the “1” position applies power to the unit.
4.2 Keypad, Indicators, and LCD Display
Next, make yourself familiar with the keypad and indicators on the switch. The
front panel indicates switch operation and status. If you have the 32-port model,
also review
Section 4.3
for how to use its LCD display.
4.2.1 K
EYPAD
The keypad enables menu selection and parameter setup for the switch.
Table 4-1. Keypad functions.
Key
Function
Menu
Returns to the switch’s setup and configuration main menu.
Enter
Selects the highlighted setup parameter.
Up, Down,
Scrolls the cursor to enable menu selection.
Right, and
Left Arrows
Содержание SW595A
Страница 3: ......