Ventless Hood System
Installation
10
Leveling
1. Adjust the four feet provided on the bottom of the unit so there is a minimum of 6” clearance
below the frame side members (NSF/UL REQUIREMENTS).
2. Check for level from side to side and front to back using a 4’ level placed appropriately on the
frame.
Содержание Ventless Hood System FH-28
Страница 1: ...Ventless Hood System MODEL FH 28 Installation Operation Manual Serial Numbers 123046 and higher ...
Страница 20: ...Ventless Hood System Installation 18 ...
Страница 24: ...P O Box 80400 Simpsonville S C 29680 0400 USA http www bkideas com Made and printed in the U S A LI0114 0407 ...